Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

OG question

Expert replies
by GaneshMalkar » Mon Mar 18, 2013 11:43 pm
At a loading dock, each worker on the night crew loaded 3/4 as many boxes as each worker on the day crew. If the night crew has 4/5 as many workers as the day crew, what fraction of all the boxes loaded by the two crews did the day crew load?

(A) 1/2
(B) 2/5
(C) 3/5
(D) 4/5
(E) 5/8

OA - E
If you cant explain it simply you dont understand it well enough!!!
- Genius
Join the discussion
Source: — Problem Solving |

by Anju@Gurome » Mon Mar 18, 2013 11:53 pm
GaneshMalkar wrote:At a loading dock, each worker on the night crew loaded 3/4 as many boxes as each worker on the day crew. If the night crew has 4/5 as many workers as the day crew, what fraction of all the boxes loaded by the two crews did the day crew load?
Let us assume, number of workers in the day crew = w
Hence, Number of workers in the night crew = 4w/5.

Also assume that the total number of boxes loaded by the day crew = x
So, Number of boxes loaded by each of the workers in the day crew = x/w.
--> Number of boxes loaded by each of the workers in the night crew = (3/4)*(x/w).
--> Total number of boxes loaded by the night crew = Number of workers in the night crew * Boxes loaded by each of the workers in the night crew = (4w/5)*[(3/4)*(x/w)] = 3x/5.

Therefore, total number of boxes loaded by the two crews = Boxes loaded by the day crew + Boxes loaded by the night crew = x + 3x/5 = 8x/5.

Therefore, required fraction = Boxes loaded by the day crew/Total number of boxes loaded by the two crews = x/(8x/5) = 5/8.

The correct answer is E.
Anju Agarwal
Quant Expert, Gurome

Backup Methods : General guide on plugging, estimation etc.
Wavy Curve Method : Solving complex inequalities in a matter of seconds.

§ GMAT with Gurome § Admissions with Gurome § Career Advising with Gurome §
Join the discussion

by GMATGuruNY » Tue Mar 19, 2013 3:02 am
At a loading dock, each worker on the night crew loaded 3/4 as many boxes as each worker on the day crew. If the night crew has 4/5 as many workers as the day crew, what fraction of all the boxes loaded by the two crews did the day crew load?

(A) 1/2

(B) 2/5

(C) 3/5

(D) 4/5

(E) 5/8

Source: OG-12
[spoiler]OA (E) And I dont understand how. Can someone please guide?[/spoiler]
Day crew:
Let the number of workers = 5.
Let the number of boxes loaded by each worker = 4.
Total number of boxes loaded = 5*4 = 20.

Night crew:
Since the night crew has 4/5 as many workers as the day crew, the number of workers on the night crew = (4/5)5 = 4.
Since each worker on the night crew loaded 3/4 as many boxes as each worker on the day crew, the number of boxes loaded by each night crew worker = (3/4)4 = 3.
Total number of boxes loaded = 4*3 = 12.

(Boxes loaded by the day crew)/(Total number of boxes loaded by the two crews) = 20/(20+12) = 20/32 = 5/8.

The correct answer is E.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Brent@GMATPrepNow » Tue Mar 19, 2013 6:02 am
GaneshMalkar wrote:At a loading dock, each worker on the night crew loaded 3/4 as many boxes as each worker on the day crew. If the night crew has 4/5 as many workers as the day crew, what fraction of all the boxes loaded by the two crews did the day crew load?

(A) 1/2
(B) 2/5
(C) 3/5
(D) 4/5
(E) 5/8

OA - E
Since the two pieces of information regarding the night shift are related to the information regarding the day shift, let's assign some nice values to the day shift.

Number of workers

Day shift: 5 workers (this is an easy number to find 4/5 of)
Night shift: 4 workers (4/5 of 5 = 4)

Boxes loaded per worker
Day shift: 4 boxes per worker
Night shift: 3 boxes per worker (3/4 of 4 = 3)

Total boxes loaded
Day shift: 5 workers times 4 boxes per worker = 20 boxes
Night shift: 4 workers times 3 boxes per worker = 12 boxes

Combined total boxes for both shifts = 20 + 12 = 32

Of the 32 boxes, the day shift loaded 20 of them.
20/32 = 5/8 = E

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion