BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
Vote for Target Test Prep, Newsweek Readers’ Choice Awards 2026
NEWSWEEK READERS’ CHOICE 2026

BIG NEWS! Target Test Prep has been nominated, and they’d love your vote!

TTP has worked incredibly hard to build the best test prep experience possible, and winning Newsweek’s 2026 Readers’ Choice Award for Best Test Prep would mean a lot to them. If TTP has helped you, they’d be incredibly grateful for your vote. You can vote once each day through September 9.

Vote for TTP
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Nuclear Power Plants

Expert replies
by goelmohit2002 » Mon Mar 16, 2009 10:59 pm
Hi All,

Can somebody please help me in the following question ? I will post OA after some discussion..so that people's reasoning do not get biased by looking at the OA.

If the check valves in nuclear power plants do not function properly, other parts of the plants’ piping systems can be critically damaged. Check valves cannot be tested in actual operation, but they are disassembled as part of routine annual maintenance and any flawed parts are replaced. Therefore, power plant accidents attributable to malfunctioning check valves are unlikely to occur.
Which of the following, if true, most weakens the argument above?

(A) Approximately 80 percent of accidents in nuclear power plants are attributable to failures in piping systems.
(B) Check valves in nuclear power plants tend to wear out after a few years in operation.
(C) Disassembling check valves can expose workers to radiation if precautions are not taken.
(D) Flaws in any part of a check valve can be identified when the valve is disassembled.
(E) Errors made in the reassembly of check valves can go undetected.

Thanks
Mohit
Join the discussion
Source: — Critical Reasoning |

by PAB2706 » Tue Mar 17, 2009 12:42 am
confused between C and E

for E my reasoning is this...

conclusion is plant accidents due to check valve malfunctioning is unlikely.

to weaken i wud find an asnwer tht tell me tht it is likely tht accidents can happen due to malfunctioning check valves. wht if they are not reassembled properly.


for C

plant accidents need not necessarily be blowing up of the plant. even the employees being exposed to radiation is an accident which happens bcos of malfunctioning check valve.

If i have to choose i wud go with C.
Join the discussion

by cramya » Tue Mar 17, 2009 5:09 am
I would go with E

Conclusion: Therefore, power plant accidents attributable to malfunctioning check valves are unlikely to occur

If choice e were true the check valve has the potential to affect other parts of the piping system also leading to possibly more power plant accidents

Choice C is

Disassembling check valves can expose workers to radiation if precautions are not taken

It is within the control of the power plant employees to prevent this from happenning. It does not weaken the argument as much as E does.
Join the discussion

by ssilver0210 » Tue Mar 17, 2009 7:45 am
Answer: E

Focus on the conclusion:

Accidents due to malfunctioning check valves are unlikely.

Why?--Premise

When doing annual maintenance, any problems with the check valves will be repaired, so that they will function properly during operation.

You want to find an answer choice which weakens the conclusion stating that accidents are unlikely. If E were true, and errors made in re-assembling the valves could go unnoticed, then accidents due to malfunctioning valves would not be unlikely, because those accidents could be caused by the errors made in re-assembling the check valves.

So, I like E.
--Sean

I provide GMAT (verbal) tutoring in NYC, and over Skype/E-mail. Please contact [email protected] for further information, or if you have any questions at all.
Join the discussion

by quocbao » Tue Mar 17, 2009 7:56 am
I will choose E because we're talking about Plant accidents while C only concerns about worker dangerous environment, not about accidents caused by valves.
Join the discussion

by mbadrew » Tue Mar 17, 2009 8:25 am
Mohit,

Use the w(weaken)-s(strengthen)-slash(slash the irrelevant choice) method to solve this problem. If you read the question, the summary is, because of annual maintenence faulty valves are identified and replaced. Therefore, chances of accidents are less.

A. Talks about piping system itself. We're talking about the valves only. So, slash it.

B. This actually strengthens the argument. The whole purpose of performing annual maintenence is to identify valves that need to be replaced. So eliminate this one.

C. This has nothing to do with the topic. So eliminate it.

D. Also strengthens the arguement. So eliminate it.

E. aah yes! This is a logical possibility that can lead to accidents. Therefore, it weakens the arguement. So, I'll pick this answer.
Join the discussion

by S0laris » Tue Mar 17, 2009 9:51 am
IMO
A - is correct

I feel this way because there is the indication that if check valves failes - other parts of the plants’ piping systems can be critically damaged.
Thus, if piping is damaged, as A states, then "check valves" was the reason.
we are the champions !
Join the discussion

by goelmohit2002 » Tue Mar 17, 2009 10:25 am
Thanks Guys.

OA is "E"....

I will understand all the reasonings of you guys and will come back with any queries. :-)
Join the discussion

by nicolette » Sun May 15, 2016 8:00 am
I totally agree. Answer should be C