Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

MGMAT tough ratio sum

Expert replies
by vkb16 » Sat May 02, 2009 1:23 am
as the pic, OA after a few replies

the solution says it ''assumes'' that the faster machine does 2 of the 3 loads. What the hell? how? and why??
You do not have the required permissions to view the files attached to this post.
Join the discussion
Source: — Problem Solving |

by DeepakR » Sat May 02, 2009 2:11 am
Average dryer takes 80 minutes for 1 full load

Given that, Ratio of the speed of Super/Ratio of speed of Average dryer = 5/4

i.e If S takes 4 minutes to complete A will take 5 minute on average.

If A takes 80 mins for 1Load
Hence S will take 64 mins for 1 load. For 3 loads S will take 64 * 3= 192 minutes.

So if he is starting the load in both the dryers

In the 64th min - S will complete the 1st load and will proceed with the 2nd load and complete the 3rd load at 128th minute.

In the mean time A will do the 2nd load at the 80th minute.

Hence total time = 64+80+64= 208 mins. I am not sure if this correct.

-Deepak
Join the discussion

by maihuna » Sat May 02, 2009 4:47 am
speed of avg mc = 80 minute per round
faster mc = (80/5)*4 = 64 minute per round

there are three lots: by faster mc it will take: 64*3 = 192 minutes

Combined average : 1/64 + 1/80 = (5+4)/16*4*5 = 9/16*4*5

One lot will take : 16*4*5/9
3 lot will take : 3*16*4*5/9 = 320/3 = 106.66 minutes.
Join the discussion

by dumb.doofus » Sat May 02, 2009 2:31 pm
I dont think there is any need to find average or anything.. just sequential loading of machine is enough for us to determine the total time..

Of course we need to use the faster machine twice coz it does the job faster for us..

ok. steps:

1. Time taken by Average machine per load = 80 mins
ratio is 5:4 so,
2. Time taken by faster machine per load = 64 mins..

so the total time taken would be twice the time for the faster machine i.e. 128 mins.. that's it.. coz in that time, the slower machine would finish one round of laundry..

so answer is 128 mins and that's the total time
One love, one blood, one life. You got to do what you should.
https://dreambigdreamhigh.blocked/
https://gmattoughies.blocked/
Join the discussion

by DeepakR » Sat May 02, 2009 7:25 pm
Dumb doofus I thought that the question had asked for the total time taken by both the machines together. I couldn't interpret it as time taken only by S alone. Am I missing something ? I would be happy if someone/you can help me here.

-Deepak
Join the discussion

by vkb16 » Sat May 02, 2009 9:12 pm
hi.. heres the solution as given in the text...

thanks for the explantion dumb.doofus, I only had that part to clear out

thanks all :D
You do not have the required permissions to view the files attached to this post.
Join the discussion

by cramya » Sat May 02, 2009 9:40 pm
The question may be there for people to decipher the 5:4 ratio part

5 parts is 80
4 parts will be 64

Good solution, Dumb.Doofus.

Regards,
CR
Join the discussion