BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
Vote for Target Test Prep, Newsweek Readers’ Choice Awards 2026
NEWSWEEK READERS’ CHOICE 2026

BIG NEWS! Target Test Prep has been nominated, and they’d love your vote!

TTP has worked incredibly hard to build the best test prep experience possible, and winning Newsweek’s 2026 Readers’ Choice Award for Best Test Prep would mean a lot to them. If TTP has helped you, they’d be incredibly grateful for your vote. You can vote once each day through September 9.

Vote for TTP
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Manhattan DS

Expert replies
by karmayogi » Thu Dec 25, 2008 3:42 am
The total cost of producing item X is equal to the sum of item X's fixed cost and variable cost. If the variable cost of producing X decreased by 5% in January, by what percent did the total cost of producing item X change in January?

(1) The fixed cost of producing item X increased by 13% in January.

(2) Before the changes in January, the fixed cost of producing item X was 5 times the variable cost of producing item X.

OA C
Each soul is potentially divine. The goal is to manifest this divine within.
--By Swami Vivekananda
Join the discussion
Source: — Data Sufficiency |

by karmayogi » Thu Dec 25, 2008 3:50 am
I got it wrong; I selected B.

Reason: The cost of item X has two parts: fixed and variable. If one part is fixed then it should not vary. With this logic, I thought 2 statement is sufficient. Suppose value of variable component was x before jan then the percentage change
= (((5x + 0.95x) - (5x+x))/(5x+x))*100
= 5/6%

Is it possible that fixed component varies? and if yes then what the difference between fixed component and variable component?
Each soul is potentially divine. The goal is to manifest this divine within.
--By Swami Vivekananda
Join the discussion

by cramya » Thu Dec 25, 2008 4:00 am
https://www.beatthegmat.com/fixed-cost-a ... 17188.html

Stuart has provided an explanation. I understand your interpretation of word fixed (in strict sense something that stays constant) but in the gmat ds world unless we are given fixed cost is the same we cannot assume it is.
Join the discussion

by scoobydooby » Thu Dec 25, 2008 4:03 am
fixed means something that does not vary with quantity. Variable costs vary with quantity.
TC: F+VC, VC=Vq (Variable part increases when quantity increases, decreases when quantity decreases)

F and V can be increased, if F increases by 13%, new Fixed cost= 1.13F, new VC=0.95VC, with statement 1 we still have 2 variables F and VC

statement 2: relation between F and VC.no information on change
combining, all VCs expressed as F, the % change can be found
Join the discussion

by cramya » Thu Dec 25, 2008 4:06 am
fixed means something that does not vary with quantity.
Like I said above for this problem we cannot assume it is based on a definition of term "fixed". It leads us in to a DS trap.

Therefore the answer is not [spoiler]B)[/spoiler] but [spoiler]C)[/spoiler]

Hope this helps!
Join the discussion

by karmayogi » Thu Dec 25, 2008 4:26 am
scoobydooby wrote:fixed means something that does not vary with quantity. Variable costs vary with quantity.
TC: F+VC, VC=Vq (Variable part increases when quantity increases, decreases when quantity decreases)

F and V can be increased, if F increases by 13%, new Fixed cost= 1.13F, new VC=0.95VC, with statement 1 we still have 2 variables F and VC

statement 2: relation between F and VC.no information on change
combining, all VCs expressed as F, the % change can be found
Your definitions of fixed and variable components are absolutely correct. But with your expressions, TC: F+VC, you have added one more variable C, and you are assuming C is constant. And fortunately C is indeed constant, equal to 1. How?

Problem talks about "total cost of producing item X." That means, through out it's talking about single item.

Now things are falling into place. Thanks cramya and scoobydooby.
Each soul is potentially divine. The goal is to manifest this divine within.
--By Swami Vivekananda
Join the discussion