BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Machines X and Y run simultaneously at their respective cons

Expert replies
by hazelnut01 » Sun May 21, 2017 5:12 am
Machines X and Y run simultaneously at their respective constant rates. If machine X produces 400 bolts per hour, how many bolts do machines X and Y produce per hour?

(1) Machine X takes twice as long to produce 400 bolts as it does for machines X and Y, working together, to produce the same number of bolts.

(2) Machines X and Y produce bolts at the same rate.

OA=D
Join the discussion
Source: — Data Sufficiency |

by [email protected] » Sun May 21, 2017 10:40 am
Hi ziyuenlau,

This DS question doesn't actually require that much 'math' - but you do have to keep track of the information that you're given to get the correct answer.

We're told that Machine X and Machine Y each have a constant rate of production (Machine X's rate is 400 bolts/hour) and that the Machines run simultaneously. We're asked how many bolts are produced by the 2 machines per hour.

1) Machine X takes twice as long to produce 400 bolts as it does for machines X and Y, working together, to produce the same number of bolts.

We already know that Machine X produces 400 bolts in 1 hour. Fact 1 tells us that 1 hour is TWICE as long as the time it takes the two machines to produce those same 400 bolts. Thus, the two machines (working together) can produce 400 bolts in 1/2 hour. We know that Machine X would produce 200 of those bolts in 1/2 hour, so the other 200 bolts must be produced by Machine Y during that time. We now know Machine Y's rate (it's 400 bolts/hour).
Fact 1 is SUFFICIENT.

2) Machines X and Y produce bolts at the same rate.

Since we already know that Machine X produces 400 bolts/hour, we now know that Machine Y also produces 400 bolts/hour.
Fact 2 is SUFFICIENT.

Final Answer: D

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by DavidG@VeritasPrep » Sun May 21, 2017 1:02 pm
hazelnut01 wrote:Machines X and Y run simultaneously at their respective constant rates. If machine X produces 400 bolts per hour, how many bolts do machines X and Y produce per hour?

(1) Machine X takes twice as long to produce 400 bolts as it does for machines X and Y, working together, to produce the same number of bolts.

(2) Machines X and Y produce bolts at the same rate.

OA=D
1) If it takes X twice as long to produce 400 bolts as it does for the machines working together, and machine X can do 400 bolts in an hour, then we know that together they can do 400 bolts in 1/2 hour, or 800 bolts in one hour. Sufficient.

2) If X produces 400 bolts in an hour and Y produces 400 bolts in an hour, then clearly, they're doing 800 bolts in an hour together. Sufficient.

The answer is D.
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion