Live GMAT classes with Target Test Prep start Nov 30 and Dec 6. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Machines X and Y run simultaneously at their respective cons

Expert replies
by hazelnut01 » Sun May 21, 2017 5:12 am
Machines X and Y run simultaneously at their respective constant rates. If machine X produces 400 bolts per hour, how many bolts do machines X and Y produce per hour?

(1) Machine X takes twice as long to produce 400 bolts as it does for machines X and Y, working together, to produce the same number of bolts.

(2) Machines X and Y produce bolts at the same rate.

OA=D
Join the discussion
Source: — Data Sufficiency |

by [email protected] » Sun May 21, 2017 10:40 am
Hi ziyuenlau,

This DS question doesn't actually require that much 'math' - but you do have to keep track of the information that you're given to get the correct answer.

We're told that Machine X and Machine Y each have a constant rate of production (Machine X's rate is 400 bolts/hour) and that the Machines run simultaneously. We're asked how many bolts are produced by the 2 machines per hour.

1) Machine X takes twice as long to produce 400 bolts as it does for machines X and Y, working together, to produce the same number of bolts.

We already know that Machine X produces 400 bolts in 1 hour. Fact 1 tells us that 1 hour is TWICE as long as the time it takes the two machines to produce those same 400 bolts. Thus, the two machines (working together) can produce 400 bolts in 1/2 hour. We know that Machine X would produce 200 of those bolts in 1/2 hour, so the other 200 bolts must be produced by Machine Y during that time. We now know Machine Y's rate (it's 400 bolts/hour).
Fact 1 is SUFFICIENT.

2) Machines X and Y produce bolts at the same rate.

Since we already know that Machine X produces 400 bolts/hour, we now know that Machine Y also produces 400 bolts/hour.
Fact 2 is SUFFICIENT.

Final Answer: D

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by DavidG@VeritasPrep » Sun May 21, 2017 1:02 pm
hazelnut01 wrote:Machines X and Y run simultaneously at their respective constant rates. If machine X produces 400 bolts per hour, how many bolts do machines X and Y produce per hour?

(1) Machine X takes twice as long to produce 400 bolts as it does for machines X and Y, working together, to produce the same number of bolts.

(2) Machines X and Y produce bolts at the same rate.

OA=D
1) If it takes X twice as long to produce 400 bolts as it does for the machines working together, and machine X can do 400 bolts in an hour, then we know that together they can do 400 bolts in 1/2 hour, or 800 bolts in one hour. Sufficient.

2) If X produces 400 bolts in an hour and Y produces 400 bolts in an hour, then clearly, they're doing 800 bolts in an hour together. Sufficient.

The answer is D.
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion