BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
Vote for Target Test Prep, Newsweek Readers’ Choice Awards 2026
NEWSWEEK READERS’ CHOICE 2026

BIG NEWS! Target Test Prep has been nominated, and they’d love your vote!

TTP has worked incredibly hard to build the best test prep experience possible, and winning Newsweek’s 2026 Readers’ Choice Award for Best Test Prep would mean a lot to them. If TTP has helped you, they’d be incredibly grateful for your vote. You can vote once each day through September 9.

Vote for TTP
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Machines \(X\) and \(Y\) produced identical bottles at different constant rates. Machine \(X,\) operating alone for

Expert replies
by Gmat_mission » Sun Nov 28, 2021 6:45 am

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

Machines \(X\) and \(Y\) produced identical bottles at different constant rates. Machine \(X,\) operating alone for \(4\) hours, filled part of a production lot; then Machine \(Y,\) operating alone for \(3\) hours, filled the rest of this lot. How many hours would it have taken Machine \(X\) operating alone to fill the entire production lot?

(1) Machine \(X\) produced \(30\) bottles per minute.
(2) Machine \(X\) produced twice as many bottles in \(4\) hours as Machine \(Y\) produced in \(3\) hours.

Answer: B

Source: GMAT Paper Tests
Join the discussion
Source: — Data Sufficiency |

Gmat_mission wrote:
Sun Nov 28, 2021 6:45 am
Machines \(X\) and \(Y\) produced identical bottles at different constant rates. Machine \(X,\) operating alone for \(4\) hours, filled part of a production lot; then Machine \(Y,\) operating alone for \(3\) hours, filled the rest of this lot. How many hours would it have taken Machine \(X\) operating alone to fill the entire production lot?

(1) Machine \(X\) produced \(30\) bottles per minute.
(2) Machine \(X\) produced twice as many bottles in \(4\) hours as Machine \(Y\) produced in \(3\) hours.

Answer: B

Source: GMAT Paper Tests
Given: Machines X and Y produced identical bottles at different constant rates. Machine X, operating alone for 4 hours, filled part of a production lot; then Machine Y, operating alone for 3 hours, filled the rest of this lot.
Let x = Machine X's RATE (in terms of the fraction of the job completed PER HOUR)
Let y = Machine Y's RATE (in terms of the fraction of the job completed PER HOUR)

So, in 4 hours, the portion of the job completed by Machine X = 4x
Likewise, in 3 hours, the portion of the job completed by Machine Y = 3y

Since the entire job is completed after both machines perform their individual tasks, we can write: 4x + 3y = 1 (1 represents the entire job completed)

Target question: How many hours would it have taken Machine X operating alone to fill the entire production lot?

Statement 1: Machine X produced 30 bottles per minute.
Since we're given no information about Machine Y, it is impossible to answer the target question with certainty
Statement 1 is NOT SUFFICIENT

Statement 2: Machine X produced twice as many bottles in 4 hours as Machine Y produced in 3 hours.
In 4 hours, the portion of the job completed by Machine X = 4x
In 3 hours, the portion of the job completed by Machine Y = 3y
From statement 2, we can write: 4x = (2)(3y)
Simplified to get: 4x = 6y

We now have the following system of equations:
4x + 3y = 1
4x = 6y

Since we COULD solve this system of equations for x and for y, we COULD determine Machine X's RATE, which means we COULD determine how many hours it would have taken machine X to fill the entire production lot on its own.
Of course, we would never waste valuable time on test day performing such tedious calculations. We need only determine that we COULD answer the target question.
Since we COULD answer the target question with certainty, the combined statements are SUFFICIENT

Answer: B

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion