Live GMAT classes with Target Test Prep start Nov 30 and Dec 6. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Machines A and B each produce tablets

Expert replies
by Needgmat » Sat Oct 15, 2016 10:34 pm
Machines A and B each produce tablets at their respective constant rates. Machine A has produced 30 tablets when Machine B is turned on. Both machines continue to run until Machine B’s total production catches up to Machine A’s total production. How many tablets does Machine A produce in the time that it takes Machine B to catch up?

(1) Machine A’s rate is twice the difference between the rates of the two machines.

(2) The sum of Machine A’s rate and Machine B’s rate is five times the difference between the two rates.

OAE
Join the discussion
Source: — Data Sufficiency |

by GMATGuruNY » Sat Oct 15, 2016 11:28 pm
The correct answer is not E but D.
Check my two posts here:
https://www.beatthegmat.com/machines-a-a ... 90000.html
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Jay@ManhattanReview » Thu Dec 29, 2016 1:31 am
Needgmat wrote:Machines A and B each produce tablets at their respective constant rates. Machine A has produced 30 tablets when Machine B is turned on. Both machines continue to run until Machine B’s total production catches up to Machine A’s total production. How many tablets does Machine A produce in the time that it takes Machine B to catch up?

(1) Machine A’s rate is twice the difference between the rates of the two machines.

(2) The sum of Machine A’s rate and Machine B’s rate is five times the difference between the two rates.

OAE
Say machine A and machine B, each produces x units. Thus, when machine B runs, machine A produces (x - 30) units.

S1: Say the rate of machine A = r, and the rate of machine B = R

Since machine B catches the production of machine A, it implies that R > r.

As per the statement: Machine A’s rate is twice the difference between the rates of the two machines, r = 2(R - r); since the difference should be positive, we must take it as (R - r) as R > r.

r = 2(R - r) => R = 3r/2

We know that the time machine A runs equals to that machine B runs.

=> (x-30)/r = x/R

=> (x-30)/r = 2x/3r; replaing the value of R =3r/2

=> 3x-90 = 2x => x =90. Thus machine A produces 90-30 = 60 tablets. A unique answer. Sufficient.

S2: The sum of Machine A’s rate and Machine B’s rate is five times the difference between the two rates.

=> r+R=5(R-r)

=> R=3r/2; it is the same relationship, we derived for S1, thus S2 itself is also sufficient.

OA: D

-Jay
_________________
Manhattan Review GMAT Prep

Locations: New York | Vienna | Kuala Lumpur | Sydney | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
Join the discussion