BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Machine A takes 10 hours to complete a certain job and start

Expert replies
by ktrout2020 » Thu Oct 31, 2019 6:27 am
Machine A takes 10 hours to complete a certain job and starts that job at 9 am. After one hour of working alone, machine A is joined by machine B and together they complete the job at 5 pm. How long would it have taken machine B to complete the job if it had worked alone for the entire job?

(A) 15 hours
(B) 18 hours
(C) 20 hours
(D) 24 hours
(E) 35 hours

Source: Veritas
Answer: E
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Fri Nov 01, 2019 6:16 am
ktrout2020 wrote:Machine A takes 10 hours to complete a certain job and starts that job at 9 am. After one hour of working alone, machine A is joined by machine B and together they complete the job at 5 pm. How long would it have taken machine B to complete the job if it had worked alone for the entire job?

(A) 15 hours
(B) 18 hours
(C) 20 hours
(D) 24 hours
(E) 35 hours

Source: Veritas
Answer: E
One approach:

Working ALONE Machine A takes 10 hours to do the job.
With Machine B's help, the job took 8 hours to complete.
So, Machine B saved Machine A 2 hours of work.

In other words, during the 7 hours that Machine B was helping, Machine B did the work that would have taken Machine A an extra 2 hours to complete.
So, it takes Machine B 7 hours to complete the same amount of work that it takes Machine A to complete in 2 hours.
So, it takes Machine B 7/2 times as long to complete what Machine A can complete

It takes Machine A 10 hours to do the job.
So, the time it takes Machine B to do the job = (10)(7/2) = 35 = E

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by deloitte247 » Sat Nov 02, 2019 2:49 pm
Workdone by A in 1 hour = 1/10 hours
Work left for A and B after 1 hour = 1 - 1/10 = 9/10
Machine A could complete the whole work in 10 hours; it did 1/10 of the work in 1 hour.
Machine B joined Machine A after 1 hour.
With their combined effort, they completed 9/10 of the work in 7 hours.
Let the total time taken for machine B to complete the work = x hours
Machine B will complete 1/x of the jon in 1 hour
Total workdone by the 2 machines in 1 hour => (1/10) + (1/x) = (x+10)/10x
Workdone by the 2 machines in 7 hours to complete 9/10 of the work =>
$$\left(\frac{x+10}{10x}\cdot7\right)=\left(\frac{9}{10}\right)$$
Divide through by 7
$$\frac{x+10}{10x}=\frac{9}{10}\cdot\frac{1}{7}\ =\ \frac{9}{70}$$
By cross multiplying
70 (x + 10) = 9 (10x)
70x + 700 = 90x
20x = 700
x = 34
Therefore, it will take machine B 35 hours to finish the work alone. Hence, option E is the correct option.
Join the discussion

by Scott@TargetTestPrep » Sun Nov 03, 2019 7:31 pm
ktrout2020 wrote:Machine A takes 10 hours to complete a certain job and starts that job at 9 am. After one hour of working alone, machine A is joined by machine B and together they complete the job at 5 pm. How long would it have taken machine B to complete the job if it had worked alone for the entire job?

(A) 15 hours
(B) 18 hours
(C) 20 hours
(D) 24 hours
(E) 35 hours

Source: Veritas
Answer: E
We let n = the number of hours that it takes machine B to complete the job by itself. We know that machine A worked for 8 hours and machine B worked for 7 hours to complete the entire job. Thus, we can create the equation:

(1/10)(8) + (1/n)(7) = 1

8/10 + 7/n = 1

4/5 + 7/n = 1

7/n = 1/5

35 = n

Answer: E