BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Machine A produces pencils at a constant rate of 9000

Expert replies
by AAPL » Tue Apr 09, 2019 6:25 am

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

GMAT Paper Tests

Machine A produces pencils at a constant rate of 9000 pencils per hour, and machine B produces pencils at a constant rate of 7000 pencils per hour. If the two machines together must produce 100,000 pencils and if each machine can operate for at most 8 hours, what is the least amount of time, in hours, that machine B must operate?

A. 4
B. 4 2/3
C. 5 1/3
D. 6
E. 6 1/4

OA A
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Tue Apr 09, 2019 6:57 am
AAPL wrote:GMAT Paper Tests

Machine A produces pencils at a constant rate of 9000 pencils per hour, and machine B produces pencils at a constant rate of 7000 pencils per hour. If the two machines together must produce 100,000 pencils and if each machine can operate for at most 8 hours, what is the least amount of time, in hours, that machine B must operate?

A. 4
B. 4 2/3
C. 5 1/3
D. 6
E. 6 1/4

OA A
To MINIMIZE machine B's operating time, we must MAXIMIZE the time machine A's operating time.
So, let machine A operate for the full 8 hours.
In 8 hours, machine A produces 72,000 pencils [8 hours x 9,000 pencils/hour =72,000 pencils]

So, the number of pencils machine B must make = 100,000 - 72,000 = 28,000

Time = output/rate
So, operating time = 28,000/7000 = 4 hours

Answer: A

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by Scott@TargetTestPrep » Wed Apr 10, 2019 4:49 pm
AAPL wrote:GMAT Paper Tests

Machine A produces pencils at a constant rate of 9000 pencils per hour, and machine B produces pencils at a constant rate of 7000 pencils per hour. If the two machines together must produce 100,000 pencils and if each machine can operate for at most 8 hours, what is the least amount of time, in hours, that machine B must operate?

A. 4
B. 4 2/3
C. 5 1/3
D. 6
E. 6 1/4

OA A
If machine B's operational time is to be minimized, we must maximize the time for machine A to operate. Since each machine can operate for at most 8 hours, we can let machine A operate for the full 8 hours. Since the rate of machine A is 9000 pencils per hour, machine A produces 8 x 9000 = 72,000 pencils, and hence 28,000 pencils are left to be produced.

Thus, it will take machine B 28,000/7,000 = 4 hours to produce the remaining pencils.

Answer: A

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion