Hi
Need help answering the attached.
Thanks
Need help answering the attached.
Thanks
You do not have the required permissions to view the files attached to this post.
Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.
See classesLearn live with an expert or move at your own pace. Every option includes the complete TTP study system.
Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.
with Josh Braslow, 20+ years in test prep
Self-paced EA prep. Study on your schedule.
with
Complete access from day one. Study on your schedule.
Let x = 120 lines.A software programmer does 20% of the work in 80% of the time, and 80% of the work in the remaining 20% of the time. If the code he writes is x lines long and he was given one month (30 days) to accomplish the task, then, assuming that the programmer works at a constant rate in each of the two stages, How many lines of code were written in the last two weeks, in terms of x?
13x/15
7x/15
7x/60
2x/3
x/2