What we see: a work rate Data Sufficiency question. Machine M makes 3,000 items and machine N makes 4,000. We need to know which one finishes first.
Step 1. Write each machine's time.
What we see: each machine works at its own constant rate.
What it means: if M makes \(m\) items per hour and N makes \(n\) per hour, M needs \(\frac{3000}{m}\) hours and N needs \(\frac{4000}{n}\) hours.
What we do and why: we only need to know which time is smaller, so we need to compare the rates, not find them.
Step 2. Statement (1): \(n = m + 1000\).
What we see: N makes 1,000 more items per hour than M.
What it means: the gap is fixed, but how much faster N is in proportion depends on how fast M is.
What we do and why: test two values. If \(m = 1000\), M needs 3 hours and N (2,000 per hour) needs 2 hours: N wins. If \(m = 5000\), M needs 0.6 hours and N (6,000 per hour) needs about 0.67 hours: M wins. Two different winners, so statement (1) is not enough.
Step 3. Statement (2): \(n = 2m\).
What we see: N works twice as fast as M.
What it means: N's time is \(\frac{4000}{2m} = \frac{2000}{m}\) hours, and M's time is \(\frac{3000}{m}\) hours.
What we do and why: \(2000 < 3000\) for any rate \(m\), so N always finishes first. Statement (2) is enough.
The trap: thinking statement (1) is enough because "N is faster." N is faster, but it also has 1,000 more items to make. A fixed extra 1,000 per hour is a big help when M is slow and a tiny help when M is fast.
Faster way: N has \(\frac{4}{3}\) as much work. It wins whenever it is more than \(\frac{4}{3}\) times as fast. Twice as fast clears that bar; "1,000 more" may or may not.
Takeaway: When two jobs are different sizes, compare the ratio of the rates with the ratio of the jobs. A fixed difference in rates does not tell you the ratio.
Answer: B