Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

If 12 men and 16 women can do a piece of work in 5 days and 13 men and 24 women can do it in 4 days, how long will 7

Expert replies
by BTGmoderatorDC » Fri Feb 26, 2021 6:21 pm
Timer
00:00
Your answer
Difficulty–

right wrong

Pick an answer to see how members did

If 12 men and 16 women can do a piece of work in 5 days and 13 men and 24 women can do it in 4 days, how long will 7 men and 10 women take to do it?

(A) 4.2 days
(B) 6.8 days
(C) 8.3 days
(D) 9.8 days
(E) 10.2 days


OA C

Source: GMAT Prep
Join the discussion
Source: — Problem Solving |

This is a great question to teach the value of approximation and leveraging the answer choices! Doing a problem like this with rote math is not the "GMAT" way of thinking about this problem.

We start with 12 men and 16 women, and they do it in 5 days.
But 13 men and 24 women can do it in 4 day.

So an extra 1 man and 8 women were able to shave 1 day off. From this, we can tell that the women don't contribute nearly as much to do the doing of the job as the men do.

We could assume that 11 men and 8 women would do the job in 6 days, and that 10 men and 0 women could do the job in 7 days, but we only have 7 men, not 10, so it's definitely going to take more than 7 days! Looking at the answer choices, (A) and (B) are quickly out.

(A) 4.2 days
(B) 6.8 days
(C) 8.3 days
(D) 9.8 days
(E) 10.2 days

Let's look back at the original numbers:

12 men/16 women = 5 days

Therefore:
6 men / 8 women = 10 days, but we have 7 men and 10 women now, so they will definitely get it done much faster than 10 days. Therefore, the answer is (C).
Join the discussion

BTGmoderatorDC wrote: ↑
Fri Feb 26, 2021 6:21 pm
If 12 men and 16 women can do a piece of work in 5 days and 13 men and 24 women can do it in 4 days, how long will 7 men and 10 women take to do it?

(A) 4.2 days
(B) 6.8 days
(C) 8.3 days
(D) 9.8 days
(E) 10.2 days


OA C

Source: GMAT Prep
Here is how it is solved:

\(5(12 M + 16 W) = 4(13 M + 24 W)\)
\(60M + 80W = 52M + 96W\)

That gives, \(8M = 16W,\) which is, \(1M=2W\)

Now, \(12 M + 16W\) can do work in \(5\) days.
So, \(12 M + 8 M\) can do work in \(5\) days.
So, \(20M\) can do work in \(5\) days.

Now, \(7M + 10W = 7M + 5M = 12 M\)

Hence, if \(20M\) can do work in \(5\) days, \(12M\) can do work in \(\dfrac{20\cdot 5}{12} = 8.33\) days.
Join the discussion

BTGmoderatorDC wrote: ↑
Fri Feb 26, 2021 6:21 pm
If 12 men and 16 women can do a piece of work in 5 days and 13 men and 24 women can do it in 4 days, how long will 7 men and 10 women take to do it?

(A) 4.2 days
(B) 6.8 days
(C) 8.3 days
(D) 9.8 days
(E) 10.2 days


OA C

Solution:

We can let the time it takes 1 man to finish the work = m, and thus the rate of 1 man = 1/m. Likewise, we can let the time it takes 1 woman to finish the work = w, and thus the rate of 1 woman = 1/w.

Thus, the combined rate of 12 men and 16 women is 12/m + 16/w. Since they can finish the work in 5 days, their combined rate is also equal to 1/5. Thus, we have:

12/m + 16/w = 1/5

Multiplying both sides of the equation by 5mw, we have:

60w + 80m = mw

Similarly, the combined rate of 13 men and 24 women is 13/m + 24/w. Since they can finish the work in 4 days, their combined rate is equal to 1/4. Thus, we have:

13/m + 24/w = 1/4

Multiplying both sides of the equation by 4mw, we have:

52w + 96m = mw

So, we have 60w + 80m = 52w + 96m (since they both equal mw).

60w + 80m = 52w + 96m

8w = 16m

w = 2m

We can now substitute w = 2m into the first equation, 12/m + 16/w = 1/5, to solve for m:

12/m + 16/(2m) = 1/5

12/m + 8/m = 1/5

20/m = 1/5

m = 100

Since m = 100 days, w = 200 days. The rate of 1 man is 1/100 and the rate of 1 woman is 1/200. Thus, the rate of 7 men and 10 women is 7/100 + 10/200 = 7/100 + 5/100 = 12/100, and the time for them to finish the same work is 1/(12/100) = 100/12 = 8.3 days.

Alternate Solution:

Alternatively, we can interpret the equation w = 2m as follows:

The time required for 1 woman to finish the job is twice that of a man, or, in other words, the job done by 2 women is equivalent to the job done by 1 man. We know 12 men and 16 women finish the job in 5 days, and as per the above discussion, this is equivalent to the job done by 12 + 16/2 = 20 men.

The question is asking for the time required to finish the job with 7 men and 10 women working, which is equivalent to 7 + 10/2 = 12 men working. We can set up an inverse proportion to find the required time: If 20 men finish a job in 5 days, then 12 men finish the job in how many days? Letting this unknown quantity be x, we have

20*5 = 12*x

x = 100/12 = 8.3 days

Answer: C

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion