right wrong
Pick an answer to see how members did
Log this miss in the free GMAT error log
Get the error logGet one like this every day: the free 60-day plan
Start the plan(1) For each group, the number of patients enrolled was 21 and the least number of days that a patient exercised last month was 5.
(2) For each group, the average (arithmetic mean) number of days that the patients exercised last month was 13.
OA E
Source: GMAT Prep













