Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Hoses A and B spout water at constant rates, and hose A can

Expert replies
by BTGmoderatorLU » Tue May 29, 2018 2:38 pm
Timer
00:00
Your answer
Difficulty–

right wrong

Pick an answer to see how members did

Hoses A and B spout water at different constant rates and hose A can fill a certain pool in 6 hours. Hose A filled the pool alone for the first 2 hours and the two hoses, working together, then finished filling the pool in another 3 hours. How many hours would it have taken hose B, working alone, to fill the entire pool?

A. 18
B. 15
C. 12
D. 6
E. 3

The OA is A.

I solved this PS question as follows,

A filled 1/3 of the pool, so 2/3 are left to be filled in 3 hours by both hoses.

(2/3)/3 = (1/6) + (1/B)
2/3 = 1/2 + 3/B
1/6 = 3/B
B = 18

Please, can anyone explain another way to solve this question? Thanks!
Join the discussion
Source: — Problem Solving |

by Keith@ThePrincetonReview » Tue May 29, 2018 5:01 pm
BTGmoderatorLU wrote:Hoses A and B spout water at different constant rates and hose A can fill a certain pool in 6 hours. Hose A filled the pool alone for the first 2 hours and the two hoses, working together, then finished filling the pool in another 3 hours. How many hours would it have taken hose B, working alone, to fill the entire pool?

A. 18
B. 15
C. 12
D. 6
E. 3

The OA is A.

I solved this PS question as follows,

A filled 1/3 of the pool, so 2/3 are left to be filled in 3 hours by both hoses.

(2/3)/3 = (1/6) + (1/B)
2/3 = 1/2 + 3/B
1/6 = 3/B
B = 18

Please, can anyone explain another way to solve this question? Thanks!


Together, hoses A and B filled 2/3 of the pool in 3 hours.
In 3 hours, hose A filled (1/6) * 3 = 1/2 of the pool.
Therefore, hose B filled 2/3 - 1/2 = 1/6 of the pool.
If hose B filled 1/6 of the pool in 3 hours, then hose B requires 6 * 3 = 18 hours to fill the pool by itself.
The correct answer is choice A.
Join the discussion

by Jeff@TargetTestPrep » Thu May 31, 2018 3:23 pm
BTGmoderatorLU wrote:Hoses A and B spout water at different constant rates and hose A can fill a certain pool in 6 hours. Hose A filled the pool alone for the first 2 hours and the two hoses, working together, then finished filling the pool in another 3 hours. How many hours would it have taken hose B, working alone, to fill the entire pool?

A. 18
B. 15
C. 12
D. 6
E. 3
We are given that hose A can fill the pool in 6 hours alone. Thus, the rate of hose A is 1/6.

Since we are not given the rate of hose B, we can let B = the number of hours it takes hose B to fill the pool alone. Thus, the rate of hose B is 1/B.

We are given that hose A worked alone for the first 2 hours and then the two hoses worked together for another 3 hours to complete the job. Thus, the time worked by hose A is 5 hours and the time worked by hose B is 3 hours. Since work = rate x time, we can calculate the work done by hose A and hose B.

Work done by hose A = (1/6) x 5 = 5/6

Work done by hose B = (1/B) x 3 = 3/B

Finally, since the completed job = 1, we can sum the work values of hoses A and B and set the sum to 1.

5/6 + 3/B = 1

Multiplying the entire equation by 6B gives us:

5B + 18 = 6B

18 = B

Thus, hose B, when working alone, can complete the job in 18 hours.

Answer: A