BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Help solving a work problem..should be easy?

Expert replies
by gen3hatch » Sun Nov 22, 2009 1:50 pm
Pumps A, B, C operate at their respective costant rates. Pump A & B operating simultaneously can fll a certain tank in 6/5 hour; pumps A &C can fill a tank simultaneously in 3/2 hour and pump B & C operating simultaneously can fill a tank in 2 hours. How many hours does it take pump A, B, & C operting simultaneously to fill the tank?
A 1/3
B 1/2
C 2/3
D 5/6
E 1

Can you show the work and calculations behind the answer?
Join the discussion
Source: — Problem Solving |

by ershovici » Mon Nov 23, 2009 1:51 am
From the question we have three different equotions:
1/A+1/B=6/5 - A+B=5/6
1/A+1/C=3/2 - A+C=2/3
1/B+1/C=2 - B+C=1/2

Add this equptions: 2A+2B+2C=12/6 = 2
2(A+B+C)=2
A+B+C = 1

I THINK ANSWER IS E
Join the discussion

by gen3hatch » Mon Nov 23, 2009 10:04 am
Yes. your right..Thanks!
Join the discussion

by heshamelaziry » Mon Nov 23, 2009 10:34 am
ershovici wrote:From the question we have three different equotions:
1/A+1/B=6/5 - A+B=5/6
1/A+1/C=3/2 - A+C=2/3
1/B+1/C=2 - B+C=1/2

Add this equptions: 2A+2B+2C=12/6 = 2
2(A+B+C)=2
A+B+C = 1

I THINK ANSWER IS E

When the questionn says A and B can do a job in 6/5 doesn't it mean that to get to 6/5 we did ------> 1/a + 1/b = 5/6 so A + B = 6/5 ?

I am confused we usually do 1/A + 1/B = 5/6 and then take the reciprocal of 5/6 to get the total time taken by A and B to do one job , so it should be A + B = 6/5


Please help :(
Join the discussion

by aspirant1 » Mon Nov 23, 2009 10:57 am
consider work = time x rate
for A+B , time 6/5 hrs

rate A+B = Work/ time; 1/(6/5) = 5/6
Join the discussion