BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

help me

Problem Solving — algebra and arithmetic (GMAT Focus Edition)
Expert replies
Source: — Quantitative Reasoning |

by Mike@Magoosh » Fri Jun 08, 2012 9:49 am
R.k91 wrote:If 2 men and 5 women do apiece of work in 8 days and 2 men and 7 children do the same piece of work in 12 days. show that 10 women can do as much work in 9 days as 31 children.
Hi, there. I'm happy to help with this. :)

This is a work question, a frequent word problem on the GMAT Quantitative.

The BIG idea with work questions: you can't add or subtract times to work or pieces of work, but you can add and subtract rates of working.

Let's express everything in terms of rate. First of all, a few variables
Rm = rate of one man working
Rw = rate of one woman working
Rc = rate of one child working

The first scenario tells us the combined rate of 2 men and 5 women is to do one piece of work in 8 days, which is a rate of (one piece of work)/(8 days) = 1/8, so
2Rm + 5 Rw = 1/8

The second scenario tells us the combined rate of 2 men and 7 children is do one piece of work in 12 days, which is a rate of (one piece of work)/(12 days) = 1/12, so
2Rm + 7Rc = 1/12

We want to relate women to children directly, so we need to eliminate men --- subtract the second equation from the first:

(2Rm + 5 Rw = 1/8)
-(2Rm + 7Rc = 1/12)
5Rw - 7Rc = 1/8 - 1/12 = 1/24

There's a problem here. We have two variables, and only one equation, and it's mathematically impossible to determine unique values for the two variables if there's only one equation. Are you sure the original problem doesn't give more information of some kind? Something about the problem as stated is not enough to work the problem through to completion. What is the source of this question?

I would be happy to help, but I think something is missing from the question.

Mike :)
Magoosh GMAT Instructor
https://gmat.magoosh.com/
Join the discussion

by dimochka » Sat Jun 09, 2012 9:11 am
Just did a quick Google search. I think there may be one or two errors in the question below; please confirm.

The first part should read "If 3 men and 5 women..."

In that case we have the below:
3Rm + 5Rw = 1/8
2Rm + 7Rc = 1/12

Bring them to equal fractions:
1Rm + 5/3Rw = 1/24
1Rm + 7/2Rc = 1/24

Subtract: 5/3Rw = 7/2Rc
Simplify: 10Rw = 21Rc

So 10 women can do as much work as 21 children, in any number of days.

If that's not the right question, I apologize; if it is, please make sure to check the post before submitting :)
Join the discussion