Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

GMAT Prep - Rates

Expert replies
by rosh26 » Sun Sep 07, 2008 9:45 am
Ok here is how I attempted this problem, want to know if my logic is correct

R's rate: 1/36
S's rate: 1/18

1/36x + 1/18x = 1/2

x = 6

I think I just got lucky with this one...

Do you have to go one step furthur to say 36 hours / 6 = 6 ???

Not sure...
You do not have the required permissions to view the files attached to this post.
Join the discussion
Source: — Problem Solving |

by GMATDavid » Mon Sep 08, 2008 6:37 am
Hi,

This question is not so bad if you convert the rates into whole numbers and then just test the answer choices.

We are not told how big the job is, so you can make up a job that is a multiple of the two rates (18 and 36). So the job can be 36 units.

Since R can complete the job in 36 hours, R's rate is 1 unit/hour. Likewise, since S can complete the job in 18 hours, S's rate is 2 units/hour.

If the entire job was completed in only 2 hours, as the question tells us, the combined rate for the entire job of 36 units was 18 units per hour. Thus, we want to find out how many S and R machines working together can work at a combined rate of 18 units per hour, where S and R each has the same number of machines running.

Here, you can just test the answer choices. If you are testing the answer choices, it is best to start with (C), because if (C) is wrong you can tell whether you need a bigger or smaller number.

(C) = 6. If 6 R machines were working at a rate of 1 unit per hour, they would produce units at a combined rate of 6 units per hour. If 6 S machines worked at a rate of 2 units per hour, they would produce units at a combined rate of 12 units per hours. Thus, the combined rate of 6 R machines and 6 S machine working together is, indeed, 18 units per hour -- which is what we are looking for.

Cheers,
David Stoll
The Princeton Review
Join the discussion

by rosh26 » Mon Sep 08, 2008 8:03 am
I think picking numbers might take me too long...is there something wrong with the method I attempted?
Join the discussion

Machine

by Ajeet Gupta » Mon Sep 08, 2008 8:52 am
Machine A takes 36 hours
Machine B takes 18 hours.

Let the work is 72 units.
So rate of A is 2 unit/hour
rate of B = 4 unit/hour

combined rate = 6 unit/hour
so, to finish the work, they need 12 hours(72/6).
to finish the work in two hours, they need to do 36 unit/hour
So, amount of unit they need is 6*6.
so they need 6 of each type.
Life is Adventure.
Join the discussion

by rosh26 » Mon Sep 08, 2008 4:38 pm
But is my method incorrect?
Join the discussion

by Shrinidhi » Wed Sep 10, 2008 10:22 pm
I did the following way :
Lets say x machines of machine R and machine S are used to do the work in 2 hours. The equation becomes :

x/36 + x/18 = 1/2
x/18 + x/9 = 1
3x = 18
x = 6
Join the discussion

Re: GMAT Prep - Rates

by anniev2 » Fri Mar 13, 2009 6:19 pm
rosh26 wrote:Ok here is how I attempted this problem, want to know if my logic is correct

R's rate: 1/36
S's rate: 1/18

1/36x + 1/18x = 1/2

x = 6

I think I just got lucky with this one...

Do you have to go one step furthur to say 36 hours / 6 = 6 ???

Not sure...
I solved this problem the exact same way. The reason I used x to multiply the rates of each machine is because the question stem said the same number of each type of machine was used.. However my way of solving was very different from Shrindidhi because I put the x on the bottom.

Which is the correct method for setting up the equation. and Why?

x/36 + x/16 = 1/2

or

1/36x + 1/18x = 1/2
Join the discussion

Re: GMAT Prep - Rates

by deepoe » Wed Apr 29, 2009 4:45 am
How did u solve the equation?
Join the discussion

Re: GMAT Prep - Rates

by kanha81 » Thu Apr 30, 2009 7:53 am
anniev2 wrote:
rosh26 wrote:Ok here is how I attempted this problem, want to know if my logic is correct

R's rate: 1/36
S's rate: 1/18

1/36x + 1/18x = 1/2

x = 6

I think I just got lucky with this one...

Do you have to go one step furthur to say 36 hours / 6 = 6 ???

Not sure...
I solved this problem the exact same way. The reason I used x to multiply the rates of each machine is because the question stem said the same number of each type of machine was used.. However my way of solving was very different from Shrindidhi because I put the x on the bottom.

Which is the correct method for setting up the equation. and Why?

x/36 + x/16 = 1/2

or

1/36x + 1/18x = 1/2
The FIRST method that you have laid out is absolutely not correct.

R: rate at which 1 m/c works= 1/36
rate at which n m/c will work= n/36 (not 1/36n)

S: rate at which 1 m/c works= 1/18
rate at which n m/c will work= n/18

Combined rates completes the work in 2 hrs.
rate at which R+S works = 1/2

n/36 + n/18 = 1/2 and solve. Hope it's clear.
Last edited by kanha81 on Thu Apr 30, 2009 11:49 am, edited 1 time in total.
Want to Beat GMAT.
Always do what you're afraid to do. Whoooop GMAT
Join the discussion

by deepoe » Thu Apr 30, 2009 9:28 am
Thanks kanha81,


It gave me a weird face when I saw their equation.
Join the discussion