BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

GMAT Prep Question (work)

Expert replies
by gxj007 » Sat Aug 22, 2009 11:16 am
Can anyone, explain the how to get the answer for this one? thanks!

A company has two types of machines, type R and type S. Operating at a constant rate, a machine of type R does a certain job in 36 hours and machine S does the same job in 18 hours. If the company used the same number of each machine to do the job in 2 hours, how many machines of type R were used?

a) 3
b) 4
c) 6
d) 9
e) 12


answer:
c) 6
Join the discussion
Source: — Problem Solving |

Re: GMAT Prep Question (work)

by ankitns » Sat Aug 22, 2009 12:45 pm
The rate at which R does the work is 1/36.
The rate at which S does the work is 1/18.

If they work together, the combined rate will be
= 1/36 + 1/18
= 3/36
= 1/12

To finish the work in 2 hours the combined rate should be 1/2. So think of it in this way: Which number multiplied by the rate of 1/12 will give you the desired rate of 1/2.

N * (1/12) = 1/2

Solving this we will get N = 6.


Hope this helps.


gxj007 wrote:Can anyone, explain the how to get the answer for this one? thanks!

A company has two types of machines, type R and type S. Operating at a constant rate, a machine of type R does a certain job in 36 hours and machine S does the same job in 18 hours. If the company used the same number of each machine to do the job in 2 hours, how many machines of type R were used?

a) 3
b) 4
c) 6
d) 9
e) 12


answer:
c) 6
Attempt 1: 710, 92% (Q 42, 63%; V 44, 97%)
Attempt 2: Coming soon!
Join the discussion

by ghacker » Sat Aug 22, 2009 10:18 pm
The answer is 6

assume the the job is making toys and there are 72 toys since R does the job in 36 hours , per hour R makes 2 toys

Similar since S does it in 18 hours , per hour S makes 4 toys

Both together makes 72 toys in 2 hours , so per hour they make 36 toys

But the factory uses the same number of machines

Then 36 = 6X number of machines

Number of machines = 6
Join the discussion