Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

GMAT Prep Question (work)

Expert replies
by gxj007 » Sat Aug 22, 2009 11:16 am
Can anyone, explain the how to get the answer for this one? thanks!

A company has two types of machines, type R and type S. Operating at a constant rate, a machine of type R does a certain job in 36 hours and machine S does the same job in 18 hours. If the company used the same number of each machine to do the job in 2 hours, how many machines of type R were used?

a) 3
b) 4
c) 6
d) 9
e) 12


answer:
c) 6
Join the discussion
Source: — Problem Solving |

Re: GMAT Prep Question (work)

by ankitns » Sat Aug 22, 2009 12:45 pm
The rate at which R does the work is 1/36.
The rate at which S does the work is 1/18.

If they work together, the combined rate will be
= 1/36 + 1/18
= 3/36
= 1/12

To finish the work in 2 hours the combined rate should be 1/2. So think of it in this way: Which number multiplied by the rate of 1/12 will give you the desired rate of 1/2.

N * (1/12) = 1/2

Solving this we will get N = 6.


Hope this helps.


gxj007 wrote:Can anyone, explain the how to get the answer for this one? thanks!

A company has two types of machines, type R and type S. Operating at a constant rate, a machine of type R does a certain job in 36 hours and machine S does the same job in 18 hours. If the company used the same number of each machine to do the job in 2 hours, how many machines of type R were used?

a) 3
b) 4
c) 6
d) 9
e) 12


answer:
c) 6
Attempt 1: 710, 92% (Q 42, 63%; V 44, 97%)
Attempt 2: Coming soon!
Join the discussion

by ghacker » Sat Aug 22, 2009 10:18 pm
The answer is 6

assume the the job is making toys and there are 72 toys since R does the job in 36 hours , per hour R makes 2 toys

Similar since S does it in 18 hours , per hour S makes 4 toys

Both together makes 72 toys in 2 hours , so per hour they make 36 toys

But the factory uses the same number of machines

Then 36 = 6X number of machines

Number of machines = 6