right wrong
Pick an answer to see how members did
Log this miss in the free GMAT error log
Get the error logGet one like this every day: the free 60-day plan
Start the planA. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512
OA D
Source: Veritas Prep
Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.
See classesLearn live with an expert or move at your own pace. Every option includes the complete TTP study system.
Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.
with Josh Braslow, 20+ years in test prep
Self-paced EA prep. Study on your schedule.
with
Complete access from day one. Study on your schedule.
right wrong
Pick an answer to see how members did
Log this miss in the free GMAT error log
Get the error logGet one like this every day: the free 60-day plan
Start the planEvery time Dwight does 1/4 of the remaining work, 3/4 of the work remains.BTGmoderatorDC wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?
A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512
The best way to solve this problem is to keep track of the fraction of the barn that still needs to be completed after each of their shifts:BTGmoderatorDC wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?
A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512
OA D
Source: Veritas Prep
