BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Dwight and Mose decide to build a new barn on their farm, an

Expert replies
by BTGmoderatorDC » Mon Jan 28, 2019 11:04 pm

Timer

00:00

Answers

A

0%

B

0%

C

0%

D

0%

E

0%

Stats

Difficulty

0% CorrectAvg —

0% IncorrectAvg —

Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

OA D

Source: Veritas Prep
Join the discussion
Source: — Problem Solving |

by fskilnik@GMATH » Tue Jan 29, 2019 4:30 am
BTGmoderatorDC wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512
Source: Veritas Prep
$$?\,\,:\,\,{\rm{remaining}}\,\,\left( {{\rm{fraction}}} \right)\,\,{\rm{job}}\,\,{\rm{before}}\,\,{\rm{Mose}}\,\,{\rm{third}}\,\,{\rm{shift}}$$
Dwight 1st shift = (3/4) Job remaining.
Mose 1st shift = (5/6)*(3/4) Job remaining.

Dwight 2nd shift = (3/4)*(5/6)*(3/4) Job remaining.
Mose 2nd shift = (5/6)*(3/4)*(5/6)*(3/4) Job remaining.

Dwight 3rd shift = FOCUS = (3/4) *(5/6)*(3/4)*(5/6)*(3/4) Job remaining.
$${\rm{?}}\,\,{\rm{ = }}\,\,{3 \over 4} \cdot {5 \over 6} \cdot {3 \over 4} \cdot {5 \over 6} \cdot {3 \over 4}\,\, = \,\,{1 \over 4} \cdot {5 \over 2} \cdot {1 \over 4} \cdot {5 \over 2} \cdot {3 \over 4} = {{25 \cdot 3} \over {{4^4}}} = {{75} \over {256}}$$

We follow the notations and rationale taught in the GMATH method.

Regards,
Fabio.
Fabio Skilnik :: GMATH method creator ( Math for the GMAT)
English-speakers :: https://www.gmath.net
Portuguese-speakers :: https://www.gmath.com.br
Join the discussion

by Jay@ManhattanReview » Tue Jan 29, 2019 10:34 pm
BTGmoderatorDC wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

OA D

Source: Veritas Prep
Since the question asks for the work left when Mose begins his third shift, Dwight must have done three and Mose must have done two shift.

Since we will have to deal with 1/4 three times and 1/6 two times, for the ease of calculation, let's assume that total work = (4^3)*(6^2) = 2304

1. Work done by Dwight in I shift = 1/4 of 2304 = 576;
2. Work left = [(4^3)*(6^2)] - 576 = 2304 - 576 = 1728;

3. Work done by Mose in I shift = 1/6 of 1728 = 288;
4. Work left = 1728 - 288 = 1440;

5. Work done by Dwight in II shift = 1/4 of 1440 = 360;
6. Work left = 1440 - 360 = 1080;

7. Work done by Mose in II shift = 1/6 of 1080 = 180;
8. Work left = 1080 - 180 = 900;

9. Work done by Dwight in III shift = 1/4 of 900 = 225;
10. Work left = 900 - 225 = 675

Part of work left to finish when Mose begins his third shift = 675/2304 = 225/768 = 75/256

The correct answer: D

Hope this helps!

-Jay
_________________
Manhattan Review GMAT Prep

Locations: GMAT Classes San Francisco | GMAT Tutoring Boston | GRE Prep Philadelphia | TOEFL Prep Classes DC | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
Join the discussion

by kyuhunl » Tue Jan 29, 2019 10:57 pm
BTGmoderatorDC wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

OA D

Source: Veritas Prep
3/4 * 5/6 * 3/4 * 5/6 * 3/4 = 75/256
Join the discussion