BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Dwight and Mose decide to build a new barn on their farm, an

Expert replies
by BTGmoderatorDC » Mon Jan 28, 2019 11:04 pm

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

OA D

Source: Veritas Prep
Join the discussion
Source: — Problem Solving |

by fskilnik@GMATH » Tue Jan 29, 2019 4:30 am
BTGmoderatorDC wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512
Source: Veritas Prep
$$?\,\,:\,\,{\rm{remaining}}\,\,\left( {{\rm{fraction}}} \right)\,\,{\rm{job}}\,\,{\rm{before}}\,\,{\rm{Mose}}\,\,{\rm{third}}\,\,{\rm{shift}}$$
Dwight 1st shift = (3/4) Job remaining.
Mose 1st shift = (5/6)*(3/4) Job remaining.

Dwight 2nd shift = (3/4)*(5/6)*(3/4) Job remaining.
Mose 2nd shift = (5/6)*(3/4)*(5/6)*(3/4) Job remaining.

Dwight 3rd shift = FOCUS = (3/4) *(5/6)*(3/4)*(5/6)*(3/4) Job remaining.
$${\rm{?}}\,\,{\rm{ = }}\,\,{3 \over 4} \cdot {5 \over 6} \cdot {3 \over 4} \cdot {5 \over 6} \cdot {3 \over 4}\,\, = \,\,{1 \over 4} \cdot {5 \over 2} \cdot {1 \over 4} \cdot {5 \over 2} \cdot {3 \over 4} = {{25 \cdot 3} \over {{4^4}}} = {{75} \over {256}}$$

We follow the notations and rationale taught in the GMATH method.

Regards,
Fabio.
Fabio Skilnik :: GMATH method creator ( Math for the GMAT)
English-speakers :: https://www.gmath.net
Portuguese-speakers :: https://www.gmath.com.br
Join the discussion

by Jay@ManhattanReview » Tue Jan 29, 2019 10:34 pm
BTGmoderatorDC wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

OA D

Source: Veritas Prep
Since the question asks for the work left when Mose begins his third shift, Dwight must have done three and Mose must have done two shift.

Since we will have to deal with 1/4 three times and 1/6 two times, for the ease of calculation, let's assume that total work = (4^3)*(6^2) = 2304

1. Work done by Dwight in I shift = 1/4 of 2304 = 576;
2. Work left = [(4^3)*(6^2)] - 576 = 2304 - 576 = 1728;

3. Work done by Mose in I shift = 1/6 of 1728 = 288;
4. Work left = 1728 - 288 = 1440;

5. Work done by Dwight in II shift = 1/4 of 1440 = 360;
6. Work left = 1440 - 360 = 1080;

7. Work done by Mose in II shift = 1/6 of 1080 = 180;
8. Work left = 1080 - 180 = 900;

9. Work done by Dwight in III shift = 1/4 of 900 = 225;
10. Work left = 900 - 225 = 675

Part of work left to finish when Mose begins his third shift = 675/2304 = 225/768 = 75/256

The correct answer: D

Hope this helps!

-Jay
_________________
Manhattan Review GMAT Prep

Locations: GMAT Classes San Francisco | GMAT Tutoring Boston | GRE Prep Philadelphia | TOEFL Prep Classes DC | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
Join the discussion

by kyuhunl » Tue Jan 29, 2019 10:57 pm
BTGmoderatorDC wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

OA D

Source: Veritas Prep
3/4 * 5/6 * 3/4 * 5/6 * 3/4 = 75/256