BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Dwight and Mose decide to build a new barn on their farm, an

Expert replies
by BTGmoderatorAT » Sun Dec 17, 2017 7:12 am
Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

I'm confused how to set up the formulas here. Can any experts help?
Join the discussion
Source: — Problem Solving |

by Jay@ManhattanReview » Mon Dec 18, 2017 4:31 am
ardz24 wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

I'm confused how to set up the formulas here. Can any experts help?
Say the total work is 1.

Work done by Dwight in his first shift = 1/4th of 1 = 1/4;
Work remaining = 1 - 1/4 = 3/4;

Work done by Mose in his first shift = 1/6th of 3/4 = 1/8;
Work remaining = 3/4 - 1/8 = 5/8;

Work done by Dwight in his second shift = 1/4th of 5/8 = 5/32;
Work remaining = 5/8 - 5/32 = 15/32;

Work done by Mose in his second shift = 1/6th of 15/32 = 5/64;
Work remaining = 15/32 - 5/64 = 25/64;

Work done by Dwight in his third shift = 1/4th of 25/64 = 25/256;
Work remaining = 25/64 - 25/256 = 75/256 = work left to finish when Mose begins his third shift

The correct answer: E

Hope this helps!

-Jay
_________________
Manhattan Review GMAT Prep

Locations: Beijing | Copenhagen | Oslo | Lisbon | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
Join the discussion

hi

by Scott@TargetTestPrep » Tue Sep 17, 2019 4:58 pm
BTGmoderatorAT wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

I'm confused how to set up the formulas here. Can any experts help?
The best way to solve this problem is to keep track of the fraction of the barn that still needs to be completed after each of their shifts:

Dwight's 1st shift: 1/4 ----Fraction of the barn still needs to be completed: 3/4

Mose's 1st shift: 1/6(3/4) = 1/8----Fraction of the barn still needs to be completed: 5/6(3/4) = 5/8

Dwight's 2nd shift: 1/4(5/8) = 5/32 ----Fraction of the barn still needs to be completed: 3/4(5/8) = 15/32

Mose's 2nd shift: 1/6(15/32) = 5/64 ----Fraction of the barn still needs to be completed: 5/6(15/32) = 25/64

Dwight's 3rd shift: 1/4(25/64) = 25/256 ----Fraction of the barn still needs to be completed: 3/4(25/64) = 75/256

We can see that before Mose begins his 3rd shift, 75/256 of the barn still needs to be completed.

Answer: D

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion