BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Dwight and Mose decide to build a new barn on their farm, an

Expert replies
by BTGmoderatorAT » Sun Dec 17, 2017 7:12 am
Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

I'm confused how to set up the formulas here. Can any experts help?
Join the discussion
Source: — Problem Solving |

by Jay@ManhattanReview » Mon Dec 18, 2017 4:31 am
ardz24 wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

I'm confused how to set up the formulas here. Can any experts help?
Say the total work is 1.

Work done by Dwight in his first shift = 1/4th of 1 = 1/4;
Work remaining = 1 - 1/4 = 3/4;

Work done by Mose in his first shift = 1/6th of 3/4 = 1/8;
Work remaining = 3/4 - 1/8 = 5/8;

Work done by Dwight in his second shift = 1/4th of 5/8 = 5/32;
Work remaining = 5/8 - 5/32 = 15/32;

Work done by Mose in his second shift = 1/6th of 15/32 = 5/64;
Work remaining = 15/32 - 5/64 = 25/64;

Work done by Dwight in his third shift = 1/4th of 25/64 = 25/256;
Work remaining = 25/64 - 25/256 = 75/256 = work left to finish when Mose begins his third shift

The correct answer: E

Hope this helps!

-Jay
_________________
Manhattan Review GMAT Prep

Locations: Beijing | Copenhagen | Oslo | Lisbon | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
Join the discussion

hi

by Scott@TargetTestPrep » Tue Sep 17, 2019 4:58 pm
BTGmoderatorAT wrote:Dwight and Mose decide to build a new barn on their farm, and they begin to work in alternating shifts, with Dwight taking the first shift. During each of his shifts, Dwight does 1/4 of the remaining work. During each of his shifts, Mose does 1/6 of the remaining work. How much of the barn is left to finish when Mose begins his third shift?

A. 1/24
B. 5/36
C. 25/72
D. 75/256
E. 255/512

I'm confused how to set up the formulas here. Can any experts help?
The best way to solve this problem is to keep track of the fraction of the barn that still needs to be completed after each of their shifts:

Dwight's 1st shift: 1/4 ----Fraction of the barn still needs to be completed: 3/4

Mose's 1st shift: 1/6(3/4) = 1/8----Fraction of the barn still needs to be completed: 5/6(3/4) = 5/8

Dwight's 2nd shift: 1/4(5/8) = 5/32 ----Fraction of the barn still needs to be completed: 3/4(5/8) = 15/32

Mose's 2nd shift: 1/6(15/32) = 5/64 ----Fraction of the barn still needs to be completed: 5/6(15/32) = 25/64

Dwight's 3rd shift: 1/4(25/64) = 25/256 ----Fraction of the barn still needs to be completed: 3/4(25/64) = 75/256

We can see that before Mose begins his 3rd shift, 75/256 of the barn still needs to be completed.

Answer: D

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion