BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

deck of cards

Expert replies
by jain2016 » Mon Apr 11, 2016 10:05 am
It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in y hours. If machine A operates alone for z hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?


A) 100xy-z/x+y

B) y(100x-z)/x+y

C) 100y(x-z)/x+y

D) x+y/100xy-z

E) x+y-z/100xy

OAB

Hi Experts ,

Please explain.

Thanks,

SJ
Join the discussion
Source: — Problem Solving |

by [email protected] » Mon Apr 11, 2016 10:17 am
Hi jain2016,

This question can be solved by TESTing VALUES.

Machine A takes X hours to make a deck of cards.
Machine B takes Y hours to make a deck of cards.

Since the answers are suitably complex-looking, let's choose really small, easy numbers to work with:

X = 1
Y = 2

So...
Machine A takes 1 hour to make a deck of cards
Machine B takes 2 hours to make a deck of cards
When both machines work together for 2 total hours, 3 decks of cards are made.

The question goes on to state that Machine A will work alone for Z hours, then be joined by Machine B until 100 decks are made.

Z = 1

In that first hour, Machine A will produce 1 deck of cards, leaving 99 decks to go. Since the two machines together can produce 3 decks every 2 hours, the remaining 99 decks will take...
2 hours x 33 sets = 66 hours.

We're looking for the answer that equals 66 when we plug in X=1, Y=2 and Z=1 into the answer choices.

While it "looks like" there's a lot of math to be done, most of the answers are way too small to be 66 (and it shouldn't take too long to figure that out). Only one answer equals 66

Final Answer: B

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by GMATGuruNY » Mon Apr 11, 2016 12:46 pm
It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in y hours. If machine A operates alone for z hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?

a) (100xy - z)/(x+y)
b) y(100x - z)/(x+y)
c) (x+y)/(100xy - z)
d) xz(100y - z)/(x+y+z)
e) (x+y-z)/(100xy)
Let x = 1 hour.
Since A takes 1 hour to produce a deck, A's rate = 1 deck per hour.
Let y = 2 hours.

Let A complete the ENTIRE JOB.
Since A produces 1 deck per hour, the time for A to produce all 100 decks = 100 hours.
Thus, z=100.

The question stem asks for the time that A and B work together.
Since A completes the entire job, the number of hours that A and B work together = 0. This is our target.

Now plug x=1, y=2 and z=100 into the answers to see which yields our target of 0.
A quick scan reveals that only B works:
y(100x - z)/(x+y) = 2(100*1 - 100)/(1+2) = 0.

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Matt@VeritasPrep » Mon Apr 11, 2016 12:58 pm
We could also just use a rate-time equation here: Work = R * T.

Since we're making one deck of cards, Work = 1. That means that our equations are:

Machine A:
1 = R * x
1/x = R

Machine B:
1 = R * y
1/y = R

So the machines' rates are 1/x and 1/y of the job per hour, respectively.

In z hours, Machine A will do

z * (1/x) of the job, or (z/x) of the job. That means we have (100 - z/x) left to do. One more work equation gives

Work = R * T

(100 - z/x) = (1/x + 1/y) * T

We want to solve for T, so we just divide both sides by (1/x + 1/y), and we're done!

(100 - z/x) / (1/x + 1/y) = T

(100 - z/x) / (x + y)/xy = T

xy * (100 - z/x) / (x + y) = T

(100xy - zy) / (x + y) = T
Join the discussion

by jain2016 » Tue Apr 12, 2016 1:55 am
The question stem asks for the time that A and B work together.
Since A completes the entire job, the number of hours that A and B work together = 0. This is our target.
Hi GMATGuruNY ,

Thanks for your reply.

Just a quick question if x=1 hour and y=2 hours , then A and B work together will be 3. So why A and B work together =0 ?

Please explain.

Many thanks in advance.

SJ
Join the discussion

by jain2016 » Tue Apr 12, 2016 1:56 am
In that first hour, Machine A will produce 1 deck of cards, leaving 99 decks to go. Since the two machines together can produce 3 decks every 2 hours, the remaining 99 decks will take...
2 hours x 33 sets = 66 hours.
Hi Rich ,

Can you please explain the above part? How come 66 hours?

Many thanks in advance.

SJ
Join the discussion

by [email protected] » Tue Apr 12, 2016 9:59 am
Hi jain2016,

Using the VALUES I chose...

Machine A takes 1 hour to make a deck of cards
Machine B takes 2 hours to make a deck of cards
When both machines work together for 2 total hours, Machine A makes 2 decks and Machine B makes 1 deck... for a total of 3 decks every 2 hours.

Since we get 3 decks every 2 hours

(3 decks)(33) = 99 decks
(2 hours)(33) = 66 hours

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Matt@VeritasPrep » Tue Apr 12, 2016 6:30 pm
jain2016 wrote:
The question stem asks for the time that A and B work together.
Since A completes the entire job, the number of hours that A and B work together = 0. This is our target.
Hi GMATGuruNY ,

Thanks for your reply.

Just a quick question if x=1 hour and y=2 hours , then A and B work together will be 3. So why A and B work together =0 ?

Please explain.

Many thanks in advance.

SJ
These are just hypothetical numbers that seem to have been chosen to lead to a convenient answer. y = 2 is the time it WOULD take B on its own if B were forced to work alone, but since A's rate was fast enough to complete the job solo, B didn't have to work at all.
Join the discussion