Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Copier B makes 7, and Copier C makes 19

Expert replies
by guerrero » Mon Sep 30, 2013 12:30 pm
Three copy machines are making copies of the same document. Copier A makes 12 copies per minute, Copier B makes 7, and Copier C makes 19. It costs 8 cents/copy for Copier A, 5 cents/copy for Copier B, and 11 cents/copy for Copier C. If a separate attendant has to be hired for each copier and be paid $30 per hour (you have to pay $60 if the attendant works for one hour and one minute), which copier alone will be the most efficient choice to make 1,200 copies?

A)Copier A
b)Copier B
c)Copier C
d)A and B
e)A and C

OAB
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Mon Sep 30, 2013 3:36 pm
guerrero wrote:Three copy machines are making copies of the same document. Copier A makes 12 copies per minute, Copier B makes 7, and Copier C makes 19. It costs 8 cents/copy for Copier A, 5 cents/copy for Copier B, and 11 cents/copy for Copier C. If a separate attendant has to be hired for each copier and be paid $30 per hour (you have to pay $60 if the attendant works for one hour and one minute), which copier alone will be the most efficient choice to make 1,200 copies?

A)Copier A
b)Copier B
c)Copier C
d)A and B
e)A and C

OAB
Machine A:
Time = pages/rate = 1200/12 = 100 minutes.
Since the time is between 1 and 2 hours, the worker is paid for 2 hours.
Worker cost = (hourly wage)(number of hours) = r*t = 30*2 = $60.
Page cost = (cents per page)(number of pages) = 8*1200 = 9600 cents = $96.
Total cost = 60+96 = $156.

Machine B:
Time = pages/rate = 1200/7 ≈ 170 minutes.
Since the time is between 2 and 3 hours, the worker is paid for 3 hours.
Worker cost = (hourly wage)(number of hours) = r*t = 30*3 = $90.
Page cost = (cents per page)(number of pages) = 5*1200 = 6000 cents = $60.
Total cost = 90+60 = $150.
Since B is a better option than A, eliminate A.

Machine C:
Time = pages/rate = 1200/19 ≈ 60+ minutes.
Since the time is between 1 and 2 hours, the worker is paid for 2 hours.
Since A's time is also 2 hours, and A's page cost is LESS than C's, A is a better option than C.
Thus, B is better than A, and A is better than C, B is better than C.
Eliminate C.

Machines A and B together:
Since their combined rate = 7+12 = 19 pages per minute, the time will be the same as C's time (2 hours).
Cost for 2 attendants working for 2 hours each = (number of workers)(hourly rate)(number of hours) = 2*30*2 = $120.
Since B's page cost for the entire job = $60, and A's page cost is GREATER than B's, the total cost for A and B together must be MORE than 120+60 = $180.
Thus, B alone is a better option.
Eliminate D.

Machines A and C together:
Since their combined rate = 7+19 = 26 pages per minute, the time for A and C together = pages/(combined rate) = 1200/26 = less than 60 minutes.
Since the time is less than 1 hour, the 2 workers are paid for 1 hour each.
Cost for 2 attendants working for 1 hour each = (number of workers)(hourly rate)(number of hours) = 2*30*1 = $60.
Since A's page cost for the entire job = $96, and C's page cost is GREATER than A's, the total cost for A and C together must be MORE than 60+96 = $156.
Thus, B alone is a better option.
Eliminate E.

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion