BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0563 reviews
Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep
NEWSWEEK READERS’ CHOICE AWARDS 2026

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Commander of Air Force

Expert replies
by ssgmatter » Sun Mar 28, 2010 5:15 am
General: The commander of the Air Force has recommended that we deploy the G28 aircraft in the reconnaissance mission, because the G28 can fly lower to the ground without being detected and could therefore retrieve the necessary information more efficiently than the currently stationed D12. But the D12 is already in the area and poised for takeoff, and would have just enough time to accomplish the mission if deployed immediately, while the G28 would require four days just to arrive in the area and get outfitted for the mission. Since the mission's deadline is immovable, I am forced to overrule the commander's recommendation and order the deployment of the D12.
Which of the following is assumed in the general's argument?
(A) The quality of information retrieved from the mission would be higher if the D12 were deployed than if the G28 were deployed.
(B) By the time the G28 arrived in the area and was outfitted for the mission, the D12 would have already completed the mission if deployed immediately.
(C) The ability of an aircraft to fly low to the ground is not a significant consideration when choosing aircraft for a reconnaissance mission.
(D) It would take longer for any aircraft not currently in the area besides the G28 to arrive in the area and get outfitted for the mission.
(E) Any time saved during the mission due to the operation of the more efficient G28 would not offset the additional time required to deploy the G28.

Please hep me undestand this one in details

Regards,
Phil
Join the discussion
Source: — Critical Reasoning |

by fibbonnaci » Sun Mar 28, 2010 5:38 am
conclusion: The general is planning to deploy D12 rather than G28
Premise1: Deadline is immovable
Premise2: if D12 is started immediately, it will have just enough time to complete the mission whereas G28 will require 4 days to arrive.

The premise talks about arriving late for G28 but does not mention whether it will be able to complete in the deadline or not. it is possible that G28, being efficient, can complete the work in the alloted deadline.

Assumption: G28 cannot complete the work in the alloted deadline if it starts late even though its energy efficient.

Lets look at our options:
(A) The quality of information retrieved from the mission would be higher if the D12 were deployed than if the G28 were deployed.[the author is not preferring D12 because of quality of information. infact the author himself says that G28 collect better data efficiently. Eliminated!]

(B) By the time the G28 arrived in the area and was outfitted for the mission, the D12 would have already completed the mission if deployed immediately.[This is a trap answer. The statement just mentions that by the time G28 arrives, D12 completes it mission. but we do not know if G28 too can complete it before the deadline after arriving late. It is possible that D12 completes days before the deadline. Eliminated!]

(C) The ability of an aircraft to fly low to the ground is not a significant consideration when choosing aircraft for a reconnaissance mission. [This is exactly opposite of what the stimulus tells initially. Eliminated!]

(D) It would take longer for any aircraft not currently in the area besides the G28 to arrive in the area and get outfitted for the mission.[we are bothered about only G28 and not any other aircraft. Eliminated!]

(E) Any time saved during the mission due to the operation of the more efficient G28 would not offset the additional time required to deploy the G28. [Bingo! this perfectly articulates what we have written as our assumption. this choice infact tells that the time saved due to efficiency is not sufficient to cover for the late entry. My answer]

Hope this helps!
Join the discussion

by ssgmatter » Sun Mar 28, 2010 5:41 am
Hey Fibonacci....Thankyou for such a detailed explanation for this one.

I got this.

Warm Regards,
Phil
Join the discussion