GmatKiss
- Legendary Member
- Posts: 2789
- Joined: Tue Jul 26, 2011 12:19 am
- Location: Chennai, India
- Thanked: 206 times
- Followed by:43 members
- GMAT Score:640
Am looking for some basic strategies and methods to solve Combined Work problems.
1) Machines A and B always operate independently at their respective constant rates. When working alone, machine A can fill a production lot in 5 hours, and machine B can fill the same lot in x hours. When the two machines operate simultaneously to fill the production lot, it takes them 2 hours to complete the job. What is the value of x?
2) Machine A, working alone at a constant rate, can complete a certain production lot in x hours. Machine B, working alone at a constant rate, can complete 1/5 of the same production lot in y hours. Machines A and B, working together, can complete 1/2 of the same production lot in z hours. What is the value of y in terms of x and z?
3) Machine A can complete a certain job in x hours. Machine B can complete the same job in y hours. If A and B work together at their respective rates to complete the job, which of the following represents the fraction of the job that B will not have to complete?
(x - y)/(x + y)
x/(y - x)
(x + y)/xy
y/(x - y)
y/(x + y)
1) Machines A and B always operate independently at their respective constant rates. When working alone, machine A can fill a production lot in 5 hours, and machine B can fill the same lot in x hours. When the two machines operate simultaneously to fill the production lot, it takes them 2 hours to complete the job. What is the value of x?
2) Machine A, working alone at a constant rate, can complete a certain production lot in x hours. Machine B, working alone at a constant rate, can complete 1/5 of the same production lot in y hours. Machines A and B, working together, can complete 1/2 of the same production lot in z hours. What is the value of y in terms of x and z?
3) Machine A can complete a certain job in x hours. Machine B can complete the same job in y hours. If A and B work together at their respective rates to complete the job, which of the following represents the fraction of the job that B will not have to complete?
(x - y)/(x + y)
x/(y - x)
(x + y)/xy
y/(x - y)
y/(x + y)