BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

collection of tough problems from G PREP - 31

Expert replies
by abhasjha » Mon Feb 08, 2010 3:22 am
Machines X and Y produced identical bottles at different constant rates. Machine X, operating alone for 4 hours, filled part of a production lot; then machine Y, operating alone for 3 hours, filled the rest of this lot. How many hours would it have taken machine X operating alone to fill the entire production lot?

(1) Machine X produced 30 bottles per minute.

(2) Machine X produced twice as many bottles in 4 hours as machine Y produced in 3 hours.
Join the discussion
Source: — Data Sufficiency |

by shashank.ism » Mon Feb 08, 2010 4:11 am
abhasjha wrote:Machines X and Y produced identical bottles at different constant rates. Machine X, operating alone for 4 hours, filled part of a production lot; then machine Y, operating alone for 3 hours, filled the rest of this lot. How many hours would it have taken machine X operating alone to fill the entire production lot?

(1) Machine X produced 30 bottles per minute.

(2) Machine X produced twice as many bottles in 4 hours as machine Y produced in 3 hours.


st 1: 30 bottles per min. --- not sufficient we don't how much part it has done waht is the entire lot.
st2: let total work be W so X produce 2/3 W in 4 hrs
Y produce 1/3 w IN 3 HRS.
SO IN 1 HR, X produce (2/3)/4 W= 1/6 W so it will take 6 hrs. Ans.

ans is B
My Websites:
www.mba.webmaggu.com - India's social Network for MBA Aspirants

www.deal.webmaggu.com -India's online discount, coupon, free stuff informer.

www.dictionary.webmaggu.com - A compact free online dictionary with images.

Nothing is Impossible, even Impossible says I'm possible.
Join the discussion

by sanju09 » Mon Feb 08, 2010 4:33 am
abhasjha wrote:Machines X and Y produced identical bottles at different constant rates. Machine X, operating alone for 4 hours, filled part of a production lot; then machine Y, operating alone for 3 hours, filled the rest of this lot. How many hours would it have taken machine X operating alone to fill the entire production lot?

(1) Machine X produced 30 bottles per minute.

(2) Machine X produced twice as many bottles in 4 hours as machine Y produced in 3 hours.
(1) helps us compute machine X's work in 4 hours, and not that of machine Y's at the same time, and in the absence of the total work to be done, we won't be able to determine how long it would take machine X do it. Insufficient

(2) If machine X can do 2/3 of the total job in 4 hours, then how long will it take to complete the entire job by itself, can be determined. Sufficient

[spoiler]B[/spoiler]
The mind is everything. What you think you become. -Lord Buddha



Sanjeev K Saxena
Quantitative Instructor
The Princeton Review - Manya Abroad
Lucknow-226001

www.manyagroup.com
Join the discussion

by ajith » Tue Feb 09, 2010 1:17 am
abhasjha wrote:Machines X and Y produced identical bottles at different constant rates. Machine X, operating alone for 4 hours, filled part of a production lot; then machine Y, operating alone for 3 hours, filled the rest of this lot. How many hours would it have taken machine X operating alone to fill the entire production lot?

(1) Machine X produced 30 bottles per minute.

(2) Machine X produced twice as many bottles in 4 hours as machine Y produced in 3 hours.
Say X produces x bottles per hour and Y produces y bottles per hour
Total production lot = 4x +3y

Machine x would take = (4x+3y)/x = 4+3*(y/x) hours

1) x = 30 not sufficient -we need to know y/x or x and y both
2) 4x = 2(3y) = >y/x = 2/3

Machine x would take 4+3*2/3 = 6 hours - Sufficient
Always borrow money from a pessimist, he doesn't expect to be paid back.
Join the discussion