Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Can you help me with this problem?

Expert replies
by yumi2012 » Fri Nov 08, 2013 2:32 pm
Thanks in advance
You do not have the required permissions to view the files attached to this post.
Join the discussion
Source: — Problem Solving |

by Mike@Magoosh » Fri Nov 08, 2013 4:10 pm
yumi2012 wrote:Thanks in advance
Dear Yumi,
I'm happy to help. :-)

Here's a text version of the question:
An architect is planning to incorporate several stone spheres of different sizes into the landscaping of a public park, and workers who will be applying a finish to the exterior of the spheres need to know the surface area of each sphere. The finishing process costs $92 per square meter. The surface area of a sphere is equal to 4(pi)r^2, where r is the radius of the sphere.
In the table, select the value of that closest to the cost of finishing a sphere with a 5.5-meter circumference as well as the cost of finishing a sphere with a 7.85-meter circumference.


First of all, notice circumference has the formula
c = 2(pi)r
Square this
c^2 = 4((pi)^2)(r^2)
But surface area (SA) = 4(pi)r^2
So
c^2 = 4((pi)^2)(r^2) = (pi)*[4(pi)r^2] = (pi)*SA
or
SA = (c^2)/(pi)
That's a hugely handy shortcut.

Now, we will briefly use the calculator to square the two circumferences ----
(5.5)^2 = 30.25
(7.85)^2 = 61.6225

Now, I am going to estimate like mad. For the first sphere,
Estimate (5.5)^2 as just 30, and estimate (pi) as 3. Then, SA = 10 sq meters
Estimate the cost as $90/ sq m, so total cost = 90*10 = $900, answer (A).

The second sphere has approximately double the (c^2), so it will be double the cost of the first ----- $1800, answer (C).

Does all this make sense?
Mike :-)
Magoosh GMAT Instructor
https://gmat.magoosh.com/
Join the discussion

by Brent@GMATPrepNow » Fri Nov 08, 2013 9:40 pm
An Architect is planning to incorporate several stone spheres of difference sizes into the lanscaping of a public park and workers who will be applying a finish to the exterior of the spheres need to know the surface area of each spere. The finishing process costs $92 per square meter. The surface area is equal to 4(pi)r^2, where r is the radius of the sphere.

Select the value that is the closest to the cost of finishing a sphere with a 5.50 meter circumference and the cost of finishing a sphere with a 7.85 meter circumference.

A) $900
B) $1,200
C) $1,800
D) $2,800
E) $3,200
F) $4,500
To apply the surface area formula, 4(pi)r^2, we need to calculate the radius of each sphere.

We know that circumference = 2(pi)(radius)

Sphere #1: 5.50 meter circumference
This means that 2(pi)(radius) = 5.5
So, radius = 5.5/(2pi)

Aside: in a moment, you'll see why I didn't evaluate 5.5/(2pi)

Now, we'll apply the surface area formula
Surface area = 4(pi)r^2
= 4(pi)[5.5/(2pi)]^2
= 4(pi)[30/(4pi^2)] ...approximately

Aside: 5.5^2 = 30.25
There's a nice way to make this calculation in your head.
Here's a free video on how to do so: https://www.gmatprepnow.com/module/gmat- ... ts?id=1024

Okay, moving along
Surface area = 4(pi)[30/(4pi^2)]....approximately
= 30/pi ....approximately
= a number a little less than 10 (square meters)

Since each square meter of finishing costs $92, the total cost is a little less than $920
Only answer choice A works


Sphere #2: 7.85 meter circumference
This means that 2(pi)(radius) = 7.85
So, radius = 7.85/(2pi)

Now, we'll apply the surface area formula
Surface area = 4(pi)r^
= 4(pi)[7.85/(2pi)]^2
= 4(pi)[60/(4pi^2)] ...approximately
= 60/pi ....approximately
= a number a little less than 20 (square meters)

Each square meter of finishing costs $92, so the total cost = (92)(20), which is approximately $1800
Only answer choice C is close

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion