BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
Vote for Target Test Prep, Newsweek Readers’ Choice Awards 2026
NEWSWEEK READERS’ CHOICE 2026

BIG NEWS! Target Test Prep has been nominated, and they’d love your vote!

TTP has worked incredibly hard to build the best test prep experience possible, and winning Newsweek’s 2026 Readers’ Choice Award for Best Test Prep would mean a lot to them. If TTP has helped you, they’d be incredibly grateful for your vote. You can vote once each day through September 9.

Vote for TTP
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Another Kaplan CR

Expert replies
by davy420 » Fri Oct 31, 2008 6:01 pm
The contruction of Glenn river dam on the Colorado River has caused unforeseen environmental effects. By preventing annual floods, the dam prevents the river from stirring up sediments collected on the river bottom and depositing them high on the banks of the river. These sediments are neccessary for the creation and maintanance of sandbars which form natural habitats for native fish. If the water is released from the dam annually the river would flood and thus recreate the sandbars normally found below the dam.

The prediction above relies on which of the following?

A. There are no other effects of the dam that would prevent the native fish of the river from using the sandbars below the dam

B.The flood caused by releasing water from the dam would be like a natural flood in every aspect.

C.The sandbars that would result from the artifical flooding of the river would be exactly the same size as the sandbar previously created by normal flooding

D.There are other dams upriver from the Glenn Canyon Dam that must also release water in order for the flood from the Glen Canyon dam to be successful.

E.The dam does not prevent the flow of sediments from upriver needed to replenish the sediment that inevitably wash downstream over time.

Can somebody explain why E is the answer I don't understanding the assumption here. Thanks
Join the discussion
Source: — Critical Reasoning |

by raunekk » Fri Oct 31, 2008 8:49 pm
imo:E

explanation if its OA
Join the discussion

by davy420 » Fri Oct 31, 2008 8:54 pm
OA is E its hidden behind the spoiler
Join the discussion

by 4meonly » Sun Nov 02, 2008 8:37 am
...the dam prevents the river from stirring up sediments and depositing them high on the banks of the river. These sediments are neccessary for the creation and maintanance of sandbars.

The main point here is sediments.

Conclusion is
If the water is released from the dam annually the river would flood and thus recreate the sandbars normally found below the dam.

So we need to find assumption.
To recreate the sandbars normally found below the dam the flood must not prevent the flow of sediments.

E.The dam does not prevent the flow of sediments from upriver needed to replenish the sediment that inevitably wash downstream over time.
Join the discussion

by davy420 » Sun Nov 02, 2008 9:36 pm
Oh I see. When I read E I was confused. I thought the answer said the dam had another river full of sediments that does not affect the river below the dam. Thanks for the clarification.
Join the discussion

by thirst » Sun Nov 30, 2008 9:56 pm
I know the answer is E, but E is assuming that sediment is washed away over time, which is not provided in the passage. The passage does say that by preventing annual floods, the dam prevents the river from stirring up sediments collected on the river bottom, which to me leads to the conclusion that there are sediments to stir up, but the water and current is missing to stir up the sediments. The existence of the dam prevents water to be overflowing at the section of river past the dam. The section before the dam will have more water than usual, and thus is more flooded than it would have been had there not been a dam. As such, the flooding part of the river is necessarily after the dam and not before. By releasing the dam, the portion of the river past the dam would flood and stir up sediment, while the section before the dam would not necessary stir up the river bottom as water is leaving the body of water and not entering. Sediments are stirred up when a section of the river is in the process of being flooded.

So all that is needed is for the water to be released so that it floods the river. I don't quite understand why the passage needs to assume the dam does not prevent sediments from flowing through.
Join the discussion

by peter.p.81 » Wed May 11, 2016 3:35 am
I think E is the right answer here.
Join the discussion