Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Algebra OG #137

Expert replies
by hey_thr67 » Wed Jun 13, 2012 11:06 am
At his regular hourly rate, Don had estimated the labour cost of a repair job as $336 and he was paid that amount. However, the job took 4 hrs. longer than he had estimated and, consequently, he earned $2 per hour less than his regular hourly rate. What was the time Don had estimated for the job, in hours ?

A: 28
B: 24
C: 16
D: 14
E: 12


OA is [spoiler]B [/spoiler]
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Wed Jun 13, 2012 1:02 pm
At his regular hourly rate, Don had estimated the labor cost of a repair job as $336 and he was paid that amount. However, the job took 4 hours longer than he had estimated and, consequently, he earned 2$ per hour less than his regular hourly rate. What was the time Don had estimated for the job, in hours?

28
24
16
14
12
We can plug in the answers, which represent the estimated time: 28, 24, 16, 14, or 12.
The actual time was 4 hours longer: 32, 28, 20, 18, or 16.
Since 336 is not a multiple of 32, eliminate A.
Since 336 is not a multiple of 20, eliminate C.
336 is not a multiple of 9, since the sum of its digits is not a multiple of 9.
Thus, 336 is not a multiple of 18; eliminate D.

The correct answer must be B or E.

Answer choice B: estimated time = 24, actual time = 28
Estimated payrate = 336/24 = 14.
Actual payrate = 336/28 = 12.
Difference = 14-12 = 2.
Success!

The correct answer is B.

Note that we had to try only ONE answer choice -- a very efficient way to solve the problem.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by kevincanspain » Wed Jun 13, 2012 1:23 pm
GMATGuru's approach is far more effective than mine, which assumes that pay/hour and timr taken are integers. Still, this method may be useful for other questions

We are basically looking for two factors of 336 (call them x and y) that differ by 4 and whose pairs differ by 2. The answer is the smaller of x and y

336 = 2^4 x 3 x 7

12 x 28
14 x 24
Kevin Armstrong
GMAT Instructor
Gmatclasses
Madrid
Join the discussion

by TheAnuja55 » Fri Nov 02, 2012 3:11 am
GMATGuruNY wrote:
At his regular hourly rate, Don had estimated the labor cost of a repair job as $336 and he was paid that amount. However, the job took 4 hours longer than he had estimated and, consequently, he earned 2$ per hour less than his regular hourly rate. What was the time Don had estimated for the job, in hours?

28
24
16
14
12
We can plug in the answers, which represent the estimated time: 28, 24, 16, 14, or 12.
The actual time was 4 hours longer: 32, 28, 20, 18, or 16.
Since 336 is not a multiple of 32, eliminate A.
Since 336 is not a multiple of 20, eliminate C.
336 is not a multiple of 9, since the sum of its digits is not a multiple of 9.
Thus, 336 is not a multiple of 18; eliminate D.

The correct answer must be B or E.

Answer choice B: estimated time = 24, actual time = 28
Estimated payrate = 336/24 = 14.
Actual payrate = 336/28 = 12.
Difference = 14-12 = 2.
Success!

The correct answer is B.

Note that we had to try only ONE answer choice -- a very efficient way to solve the problem.
But
Why not E ?
Join the discussion