BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Abel can complete a work in 10 days, Ben in 12 days and Carla in 15 days. All of them began the work together, but Abel

Expert replies
by VJesus12 » Sat Jan 23, 2021 1:56 pm

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

Abel can complete a work in 10 days, Ben in 12 days, and Carla in 15 days. All of them began the work together, but Abel had to leave after 2 days and Ben 3 days before the completion of the work. How long did the work last?

A. 6
B. 7
C. 8
D. 9
E. 10

Answer: B

Source: e-GMAT
Join the discussion
Source: — Problem Solving |

VJesus12 wrote:
Sat Jan 23, 2021 1:56 pm
Abel can complete a work in 10 days, Ben in 12 days, and Carla in 15 days. All of them began the work together, but Abel had to leave after 2 days and Ben 3 days before the completion of the work. How long did the work last?

A. 6
B. 7
C. 8
D. 9
E. 10

Answer: B

Solution:

We see that rates of Abel, Ben and Carla are 1/10, 1/12 and 1/15, respectively. If we let x be the number of days the work lasted, we can create the equation:

1/10 * 2 + 1/12 * (x - 3) + 1/15 * x = 1

Multiplying the equation by 60, we have:

12 + 5x - 15 + 4x = 60

9x = 63

x = 7

Answer: B

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion

VJesus12 wrote:
Sat Jan 23, 2021 1:56 pm
Abel can complete a work in 10 days, Ben in 12 days, and Carla in 15 days. All of them began the work together, but Abel had to leave after 2 days and Ben 3 days before the completion of the work. How long did the work last?

A. 6
B. 7
C. 8
D. 9
E. 10

Answer: B

Source: e-GMAT
Amount of work Carla completed \(+\) Amount of work Abel completed \(+\) Amount of work Ben completed \(=\) Total amount of work completed

\(\dfrac{t}{15} + \dfrac{2}{10} + \dfrac{t-3}{12} = 1 \Longrightarrow t = 7\)

Therefore, B