BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

A swimming pool is full of water. Pump A takes 6 hours to em

Expert replies
by Max@Math Revolution » Sun Aug 11, 2019 11:50 pm

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

[GMAT math practice question]

A swimming pool is full of water. Pump A takes 6 hours to empty the pool completely, and pump B takes 7 hours to completely empty the pool. Phil starts to use pump A to drain the pool at 1 PM. Some time later, he completes the job using both pumps A and B together. If he wants to empty the pool completely by 6 PM, at what time should Phil start pump B?

A. 3:30 PM
B. 4 PM
C. 4:20 PM
D. 4:50 PM
E. 5 PM
Join the discussion
Source: — Problem Solving |

by Max@Math Revolution » Thu Aug 15, 2019 5:28 pm
=>

Suppose Phil starts pump B at time x.
Pump A works for 5 hours, and pump B works for 6 - x hours.
Pump A empties 1/6 of the pool in 1 hour and pump B empties 1/7 of the pool in 1 hour.
So,
(1/6)*5 + (1/7)(6-x) = 1, and, after multiplying both sides by 42 we obtain 35 + 36 - 6x = 42.
Thus, x = 4 + 5/6 and pump B begins work at 4:50 pm.

Therefore, the answer is D.
Answer: D
Join the discussion

by deloitte247 » Sat Aug 17, 2019 9:49 am
Let Phil start pump B at x hours after 1 pm
Pump A works for 5 hours
Pump B works for 6 - x hours
Pump A empties 1/6 of the pool per 1 hour
Pump B empties 1/7 of the pool per 1 hour
$$\left(\frac{1}{6}\cdot\ 5\right)+\left(\frac{1}{7}\cdot\left(6-x\right)\right)=1$$
$$\left(\frac{5}{6}\right)+\frac{\left(6-x\right)}{7}=1$$
$$\frac{35+36-6x}{42}=1$$
$$35+36-6x=42$$
$$71-6x=42$$
$$-6x=43-71$$
$$\frac{-6x}{-6}=\frac{-29}{-6}$$
$$x=4\frac{5}{6}$$
$$x=4+\frac{5}{6}\ \min s$$
x = 4 : 50 pm
Phil should start pump B by 4 : 50 pm
Answer = option D
Join the discussion