BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

A satellite is composed of 30 modular units, each of which

Expert replies
by BTGModeratorVI » Fri Mar 06, 2020 5:55 pm

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

A satellite is composed of 30 modular units, each of which is equipped with a set of sensors, some of which have been upgraded. Each unit contains the same number of non-upgraded sensors. If the number of non-upgraded sensors on one unit is 1/5 the total number of upgraded sensors on the entire satellite, what fraction of the sensors on the satellite have been upgraded?

A. 5/6
B. 1/5
C. 1/6
D. 1/7
E. 1/24

Answer: D
Source: Manhattan Prep
Join the discussion
Source: — Problem Solving |

BTGModeratorVI wrote:
Fri Mar 06, 2020 5:55 pm
A satellite is composed of 30 modular units, each of which is equipped with a set of sensors, some of which have been upgraded. Each unit contains the same number of non-upgraded sensors. If the number of non-upgraded sensors on one unit is 1/5 the total number of upgraded sensors on the entire satellite, what fraction of the sensors on the satellite have been upgraded?

A. 5/6
B. 1/5
C. 1/6
D. 1/7
E. 1/24

Answer: D
Source: Manhattan Prep
Since we're asked to find a certain FRACTION, we can plug in some nice values that meet the given conditions.

Let's say that there's a TOTAL of 5 upgraded sensors on the entire satellite

the number of non-upgraded sensors on one modular unit is 1/5 the TOTAL number of upgraded sensors on the entire satellite
So, the number of non-upgraded sensors on EACH modular unit = (1/5)(5) = 1.

Since there are 30 modular units altogether, the TOTAL number of non-upgraded sensors = (30)(1) = 30.

So, the TOTAL number of sensors = (number of non-upgrades) + (number of upgraded)
= 30 + 5
= 35

What fraction of the sensors on the satellite have been upgraded?
= 5/35
= 1/7

Answer: D

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion