BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

A qualified worker digs a well in 5 hours. He invites 2 appr

Expert replies
by hazelnut01 » Wed Mar 15, 2017 6:20 pm
A qualified worker digs a well in 5 hours. He invites 2 apprentices, each working 3/4 as fast as the qualified worker and 2 trainees each working 1/5 as fast as the qualified worker. If the five-person team digs the same well, approximately how much time does the team need to finish the job?

(A) 1 hour 24 minutes
(B) 1 hour 34 minutes
(C) 1 hour 44 minutes
(D) 1 hour 54 minutes
(E) 2 hours 14 minutes
Join the discussion
Source: — Problem Solving |

by Jay@ManhattanReview » Wed Mar 15, 2017 8:01 pm
ziyuenlau wrote:A qualified worker digs a well in 5 hours. He invites 2 apprentices, each working 3/4 as fast as the qualified worker and 2 trainees each working 1/5 as fast as the qualified worker. If the five-person team digs the same well, approximately how much time does the team need to finish the job?

(A) 1 hour 24 minutes
(B) 1 hour 34 minutes
(C) 1 hour 44 minutes
(D) 1 hour 54 minutes
(E) 2 hours 14 minutes
Hi ziyuenlau,

This is a typical Time and Work question on calculating the combined rate of three persons.

We have:

Rate of the qualified worker = 1/5

Rate of two apprentices = 2∗(1/5)∗(3/4) = 3/10

Rate of two trainees = 2∗(1/5)∗(1/5) = 2/25

Combined rate of all five people = (1/5) + (3/10) + (2/25) = 29/50 part of work per hour

Time required to dig the Well = 50/29 hours = 1 hour (21/29)*60 minutes > 1 hour (21/30)*60 minutes = 1 hour 42 minutes

Since the correct answer must be a little more than 1 hour 42 minutes, the correct answer would be 1 hour 44 minutes.

The correct answer: C

Hope this helps!

Relevant book: Manhattan Review GMAT Word Problems Guide

-Jay
_________________
Manhattan Review GMAT Prep

Locations: New York | Hyderabad | Mexico City | Toronto | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
Join the discussion

by [email protected] » Wed Mar 15, 2017 10:39 pm
Hi ziyuenlau,

These types of 'Work' questions can be solved in a couple of different ways (depending on how you want to 'organize' the rate information). It can often help to think in terms of the number of worker-hours required to complete the job.

The Qualified Worker takes 5 hours to complete a job, so the job requires 5 Worker-hours of effort to be finished.

The Qualified Worker can complete 1 Worker-hour per hour.
Each of the two apprentices can complete 3/4 of a Worker-hour per hour.
Each of the two trainees can complete 1/5 of a Worker-hour per hour.

Total = 1 + 2(3/4) + 2(1/5) = 1 + 1.5 + .4 = 2.9 Worker-hours completed per hour by this group.

Since the job requires 5 Worker-hours of effort, the total time will be...

5/2.9 hours =
50/29 hours =
1 21/29 hours

21/29 is a little more than 2/3 (since 20/30 = 2/3). Thus, we're looking for an answer that is a little more than 1 2/3 hours. There's only one answer that matches....

Final Answer: C

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion