Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

a ps from gmatclub

Expert replies
by diebeatsthegmat » Tue Aug 23, 2011 7:06 pm
T can work alone and will finish job in 6 hours, P & J can do the same independently in 3 and 2 hours each. T starts working alone and after 1 hour P joins, both of them work for another 1 hour. After that J joins them and they finish the job together. What was fraction of job done by T????

1) 1/9
2) 1/6
3) 1/3
4) 7/18
5) 4/9
Join the discussion
Source: — Problem Solving |

by quantskillsgmat » Tue Aug 23, 2011 9:19 pm
i think answer shd be 7/12 which is nt in option.
total time for which t is working is 2 hrs 20 minues.
total time taken by all 3 is 4 hrs.
so fraction by t is 14/24=7/12
Join the discussion

by Anurag@Gurome » Tue Aug 23, 2011 9:29 pm
diebeatsthegmat wrote:T can work alone and will finish job in 6 hours, P & J can do the same independently in 3 and 2 hours each. T starts working alone and after 1 hour P joins, both of them work for another 1 hour. After that J joins them and they finish the job together. What was fraction of job done by T????
In first 1 hour T finishes 1/6 of the work.
In next 1 hour T and P together finish (1/6 + 1/3) = 1/2 of the work.

Hence, remaining work = (1 - 1/2 - 1/6) = 1/3

In 1 hour three of them together finish (1/6 + 1/3 + 1/2) = 1, i.e. complete work.
To finish 1/3 of the work they will take 1/3 hours.

Hence, T has worked for (1 + 1 + 1/3) = 7/3 hours.
In this time T will finish (7/3)*(1/6) = 7/18 of the job.

The correct answer is D.
Anurag Mairal, Ph.D., MBA
GMAT Expert, Admissions and Career Guidance
Gurome, Inc.
1-800-566-4043 (USA)

Join Our Facebook Groups
GMAT with Gurome
https://www.facebook.com/groups/272466352793633/
Admissions with Gurome
https://www.facebook.com/groups/461459690536574/
Career Advising with Gurome
https://www.facebook.com/groups/360435787349781/
Join the discussion

by GMATGuruNY » Wed Aug 24, 2011 3:26 am
diebeatsthegmat wrote:T can work alone and will finish job in 6 hours, P & J can do the same independently in 3 and 2 hours each. T starts working alone and after 1 hour P joins, both of them work for another 1 hour. After that J joins them and they finish the job together. What was fraction of job done by T????

1) 1/9
2) 1/6
3) 1/3
4) 7/18
5) 4/9
Let job = 6 units.
Rate for T = w/t = 6/6 = 1 unit per hour.
Rate for P = w/t = 6/3 = 2 units per hour.
Rate for J = w/t = 6/2 = 3 units per hour.

Work completed by T in 1 hour = r*t = 1*1 = 1 unit.

Combined rate for T and P = 1+2 = 3 units per hour.
Work completed by T+P in 1 hour = r*t = 3*1 = 3 units.

Remaining work = 6-1-3 = 2 units.
Combined rate for T,P and J = 1+2+3 = 6 units per hour.
Time to produce the remaining 2 units = w/r = 2/6 = 1/3 of an hour.

Total time for T = 1+1+(1/3) = 7/3 hours.
Work produced by T = r*t = 1*(7/3) = 7/3 units.
Fraction of work produced by T = (7/3)/6 = 7/18.

The correct answer is D.

If the OA is B, then the question must be asking for the fraction of the work produced by J.
Since J works only for 1/3 of an hour, work produced by J = r*t = 3*(1/3) = 1 unit.
Fraction of work produced by J = 1/6.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by akhilsuhag » Wed Aug 24, 2011 3:42 am
diebeatsthegmat wrote:T can work alone and will finish job in 6 hours, P & J can do the same independently in 3 and 2 hours each. T starts working alone and after 1 hour P joins, both of them work for another 1 hour. After that J joins them and they finish the job together. What was fraction of job done by T????

1) 1/9
2) 1/6
3) 1/3
4) 7/18
5) 4/9
Total Work: 6 (Assume)
S0 since T takes 6 hrs, his rate: 1/hr
P's Rate: 2/hr
J's Rate: 3/hr

Now T works for an hour, work done: 1
then P and T work for an hour, work done: 3 (1 + 2)

work left 2.

2= 6*t => t = 1/3.

How much work will T do in 1/3 hr.

w= 1*1/3 => 1/3

Total work done by T = 1+1+1/3 = 7/3.

Now (7/3)/6 = [spoiler]7/18 = D[/spoiler]

Basically calculate the amount of time T works and his rate.
Please press "thanks" if you think my post has helped you.. Cheers!!
Join the discussion