BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

A machine, working at a constant rate...

Expert replies
by swerve » Thu Jan 11, 2018 6:52 am
A machine, working at a constant rate, manufactures 36 straplers in 28 minutes. How many straplers does it make in 1 hr 45 min?

A. 125
B. 128
C. 135
D. 144
E. 150

The OA is C.

Please, can any expert explain this PS question for me? I tried to solve it but I can't get the correct answer. I need your help. Thanks.
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Thu Jan 11, 2018 7:11 am
swerve wrote:A machine, working at a constant rate, manufactures 36 straplers in 28 minutes. How many straplers does it make in 1 hr 45 min?

A. 125
B. 128
C. 135
D. 144
E. 150
We can solve this using equivalent ratios

We're comparing machine output (measured in # of staplers) with time (in minutes)

1 hr 45 min = 105 minutes
Let x = # of staplers that can be made in 105 minutes

We get: 36/28 = x/105
Cross multiply to get: (28)(x) = (36)(105)
Divide both sides by 28 to get: x = (36)(105)/(28)
To calculate this, it's useful to recognize that 105 = (7)(15) and 36 = (4)(9) and 28 = (4)(7)
So, we get: x = (4)(9)(7)(15)/(4)(7)
Simplify to get: x = (9)(15)
= 135

Answer: C

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by DavidG@VeritasPrep » Thu Jan 11, 2018 10:18 am
swerve wrote:A machine, working at a constant rate, manufactures 36 straplers in 28 minutes. How many straplers does it make in 1 hr 45 min?

A. 125
B. 128
C. 135
D. 144
E. 150

The OA is C.

Please, can any expert explain this PS question for me? I tried to solve it but I can't get the correct answer. I need your help. Thanks.
We could also use our trusty R * T = W formula.

R = 36 staplers/28 minutes. 36/28 = 9/7.
T = 1 hour 45 minutes = 105 minutes
9/7 * 105 = W
9*15 = W
135 = W

The answer is C
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion

by Scott@TargetTestPrep » Tue Aug 06, 2019 4:35 pm
swerve wrote:A machine, working at a constant rate, manufactures 36 straplers in 28 minutes. How many straplers does it make in 1 hr 45 min?

A. 125
B. 128
C. 135
D. 144
E. 150

The OA is C.

Please, can any expert explain this PS question for me? I tried to solve it but I can't get the correct answer. I need your help. Thanks.
We see that the machine produces 36/28 staplers per minute, so in 1 hour 45 minutes, or 105 minutes, it can produce:

36/28 x 105= 9/7 x 105 = 9 x 15 = 135 staplers

Answer: C

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion