A along with B can do 1 / 2 of the work in 60 minutes, B is four times faster than A, How long will A take to do rest of the work if it works alone?
A. 50 B. 75 C. 120 D. 150 E. 300
Join the discussion
Source: — Problem Solving |

by rijul007 » Sun Nov 13, 2011 3:24 am
rate of A = a wph (work per hour)
rate of B = b wph

rate of A and B together = (a+b) wph = 1/2 wph

b = 4 a

a + 4a = 1/2
5a = 1/2
a = 1/10
rate of A = 1/10 wph

A would take 10hrs to complete the whole work

A will complete the remaining half of the work in 5 hrs = 5*60 mins = 300 mins

Option E
Join the discussion

by GMATGuruNY » Sun Nov 13, 2011 3:43 am
colakumarfanta wrote:A along with B can do 1 / 2 of the work in 60 minutes, B is four times faster than A, How long will A take to do rest of the work if it works alone?
A. 50 B. 75 C. 120 D. 150 E. 300
Let the rate for B = 4 units per hour and the rate for A = 1 unit per hour.
Thus, in 60 minutes, A and B produce 1+4 = 5 units.
Since this is 1/2 the work, the remaining amount of work = 5 units.
Time for A to complete the work = w/r = 5/1 = 5 hours.

The correct answer is E.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion