BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Working at their respective constant rates, Paul, Abdul and

Expert replies
by BTGmoderatorLU » Wed Mar 13, 2019 2:54 pm

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

Source: Veritas Prep

Working at their respective constant rates, Paul, Abdul, and Adam alone can finish a certain work in 3, 4, and 5 hours respectively. If all three work together to finish the work, what fraction of the work will be done by Adam?

A. 1/4
B. 12/47
C. 1/3
D. 5/12
E. 20/47

The OA is B
Join the discussion
Source: — Problem Solving |

by Jay@ManhattanReview » Wed Mar 13, 2019 8:41 pm
BTGmoderatorLU wrote:Source: Veritas Prep

Working at their respective constant rates, Paul, Abdul, and Adam alone can finish a certain work in 3, 4, and 5 hours respectively. If all three work together to finish the work, what fraction of the work will be done by Adam?

A. 1/4
B. 12/47
C. 1/3
D. 5/12
E. 20/47

The OA is B
Work done by Paul, Abdul, and Adam alone in one hour = 1/3, 1/4 and 1/5, respectively.

Work done by Paul, Abdul, and Adam together in one hour = 1/3 + 1/4 + 1/5 = 47/60

Fraction of the work will be done by Adam = Part of the work done by Adam / Part of the work done by Adam Paul, Abdul, and Adam together = (1/5) / (47/60) = 12/47

The correct answer: B

Hope this helps!

-Jay
_________________
Manhattan Review GMAT Prep

Locations: GMAT Classes Glasgow | GMAT Prep Courses Hyderabad | LSAT Prep Courses San Diego | Manhattan Prep Classes SAT | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
Join the discussion

by Scott@TargetTestPrep » Fri Mar 15, 2019 4:50 am
BTGmoderatorLU wrote:Source: Veritas Prep

Working at their respective constant rates, Paul, Abdul, and Adam alone can finish a certain work in 3, 4, and 5 hours respectively. If all three work together to finish the work, what fraction of the work will be done by Adam?

A. 1/4
B. 12/47
C. 1/3
D. 5/12
E. 20/47

The OA is B

We can let t = the time during which all three people work together; thus, the combined work is:

(1/3)t + (1/4)t + (1/5)t = (20/60)t + (15/60)t + (12/60)t = (47/60)t

Thus, Adam completed (1/5)t/[(47/60)t] = 60/(47 x 5) = 12/47 of the job.

Answer: B

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion

by Scott@TargetTestPrep » Mon Mar 18, 2019 5:35 pm
BTGmoderatorLU wrote:Source: Veritas Prep

Working at their respective constant rates, Paul, Abdul, and Adam alone can finish a certain work in 3, 4, and 5 hours respectively. If all three work together to finish the work, what fraction of the work will be done by Adam?

A. 1/4
B. 12/47
C. 1/3
D. 5/12
E. 20/47

The OA is B
We can let t = the time during which all three people work together; thus, the combined work is:

(1/3)t + (1/4)t + (1/5)t = (20/60)t + (15/60)t + (12/60)t = (47/60)t

Thus, Adam will complete (1/5)t/(47/60)t = 60/(47 x 5) = 12/47 of the job.

Alternate Solution:

First, let's find how much time it takes for the three of them to complete the job. Notice that in 1 hour, Paul, Abdul and Adam can do 1/3, 1/4 and 1/5 of the job, respectively. Thus, with all of them working together,

1/3 + 1/4 + 1/5 = 47/60

of the job gets done in one hour. If 47/60 of the job takes one hour to complete, then the whole job will take 60/47 hours to complete.

Next, we can set up a proportion to determine how much of the job gets done by Adam. Keeping in mind that Adam can do 1/5 of the job in one hour, we set up the proportion: "1/5 of the job is to 1 hour as x of the job is to 60/47 hours"

(1/5)/1 = x/(60/47)

x = (1/5)*(60/47) = 12/47

Answer: B

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion