Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Work,

Expert replies
by goyalsau » Fri Nov 19, 2010 11:29 am
A man can work for three hours non-stop but then needs to take rest for half an hour. His wife can work for two hours but rests for 15 min after that, while his son can work for 1 hour before resting for half an hour. If a work takes 50 man-hours to get completed, then approximately how long will it take for the three to complete the same? Assume all of them all equally skilled in their work.


No options .
Saurabh Goyal
[email protected]
-------------------------


EveryBody Wants to Win But Nobody wants to prepare for Win.
Join the discussion
Source: — Problem Solving |

by Rahul@gurome » Fri Nov 19, 2010 11:56 am
goyalsau wrote:A man can work for three hours non-stop but then needs to take rest for half an hour. His wife can work for two hours but rests for 15 min after that, while his son can work for 1 hour before resting for half an hour. If a work takes 50 man-hours to get completed, then approximately how long will it take for the three to complete the same? Assume all of them all equally skilled in their work.
Effective work rate for the man = (3/3.5) man-hours = 6/7 man-hours/hour
Effective work rate for his wife = (2/2.25) man-hours = 8/9 man-hours/hour
Effective work rate for his son = (1/1.5) man-hours = 2/3 man-hours/hour

Total work rate of the three = (6/7 + 8/9 + 2/3) man-hours/hour = 152/63 man-hours/hour

The work requires = 50 man-hours

If they work together total time required = (50 man-hours)/Total work rate
= (50)/(152/63) hours
= (50*63)/152 hours
≈ 20 hours

Therefore it will take approximately 20 hours to complete the work for the three.
Rahul Lakhani
Quant Expert
Gurome, Inc.
https://www.GuroMe.com
On MBA sabbatical (at ISB) for 2011-12 - will stay active as time permits
1-800-566-4043 (USA)
+91-99201 32411 (India)
Join the discussion

by goyalsau » Fri Nov 19, 2010 8:01 pm
Rahul@gurome wrote:
goyalsau wrote:A man can work for three hours non-stop but then needs to take rest for half an hour. His wife can work for two hours but rests for 15 min after that, while his son can work for 1 hour before resting for half an hour. If a work takes 50 man-hours to get completed, then approximately how long will it take for the three to complete the same? Assume all of them all equally skilled in their work.
Effective work rate for the man = (3/3.5) man-hours = 6/7 man-hours/hour
Effective work rate for his wife = (2/2.25) man-hours = 8/9 man-hours/hour
Effective work rate for his son = (1/1.5) man-hours = 2/3 man-hours/hour

Total work rate of the three = (6/7 + 8/9 + 2/3) man-hours/hour = 152/63 man-hours/hour

The work requires = 50 man-hours

If they work together total time required = (50 man-hours)/Total work rate
= (50)/(152/63) hours
= (50*63)/152 hours
≈ 20 hours

Therefore it will take approximately 20 hours to complete the work for the three.
Thanks Rahul,
Saurabh Goyal
[email protected]
-------------------------


EveryBody Wants to Win But Nobody wants to prepare for Win.
Join the discussion

by RikaMueller » Sat Nov 20, 2010 2:51 am
Hi Rahul,
can you just shortly explain how you arrive at eg: 3/3.5. Is it 3.5 hrs total which the man needs into 3?
Thanks
Join the discussion

by Rahul@gurome » Sat Nov 20, 2010 3:16 am
RikaMueller wrote:Hi Rahul,
can you just shortly explain how you arrive at eg: 3/3.5. Is it 3.5 hrs total which the man needs into 3?
Thanks
The man works for 3 hours and then takes rest for 0.5 hour.
Thus effectively the man does 3 man-hours of work in 3.5 hours.
=> Work rate of the man = (3 man-hours)/(3.5 hours) = (3/3.5) man-hours/hour

Hope it is clear now.
Rahul Lakhani
Quant Expert
Gurome, Inc.
https://www.GuroMe.com
On MBA sabbatical (at ISB) for 2011-12 - will stay active as time permits
1-800-566-4043 (USA)
+91-99201 32411 (India)
Join the discussion