Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Work Rate problem

Expert replies
by [email protected] » Wed Aug 06, 2008 7:35 am
Hi

Anyone know a quick way to solve this - I got the right answer with plugging in but it took me far too long.

Thanks in advance
You do not have the required permissions to view the files attached to this post.
Join the discussion
Source: — Problem Solving |

by parallel_chase » Wed Aug 06, 2008 12:17 pm
A can complete the job in x hours, therefore A's rate = 1/x
B can complete the job in 1/x hours, therefore B's rate = x

A and B working simultaneously = x+(1/x) = (x^2+1)/x
W/(x^2+1)/x = T

T(x^2+1)/x = W

In y hours A can complete = y/x job.
Now at this point B joins A and they work together for till 100 decks are manufactured.

y/x + W = 100

y/x + [(x^2+1)/x]T =100

[(x^2+1)/x]T =100 - (y/x)
[(x^2+1)/x]T = (100x-y)/x
t = (100x-y)/(x^2+1)

Hence B is the answer.

I know it looks complicated but its not. I was able to do this in less than 1 minute. I find plugging in options very time consuming specially when one can do it easily with variables.

Let me know if you still have any doubts.
Join the discussion

by pepeprepa » Wed Aug 06, 2008 1:07 pm
Explanations of Chase are perfect, here is how I did:

Number of objects which have to be made by A and B together: (100-y/x)
Number of hours for A and B together to make 1 object: x+(1/x)
Therefore,
(100-y/x) / (x+(1/x)) = 100x - y / x^2 + 1
Join the discussion

by [email protected] » Thu Aug 07, 2008 2:18 am
Thanks very much for the explanations guys!