Average dryer takes 80 minutes for 1 full load
Given that, Ratio of the speed of Super/Ratio of speed of Average dryer = 5/4
i.e If S takes 4 minutes to complete A will take 5 minute on average.
If A takes 80 mins for 1Load
Hence S will take 64 mins for 1 load. For 3 loads S will take 64 * 3= 192 minutes.
So if he is starting the load in both the dryers
In the 64th min - S will complete the 1st load and will proceed with the 2nd load and complete the 3rd load at 128th minute.
In the mean time A will do the 2nd load at the 80th minute.
Hence total time = 64+80+64= 208 mins. I am not sure if this correct.
-Deepak