What we see: a Data Sufficiency question about a work rate. The machine runs nonstop at one steady speed. We need the clock time when it finished the order.
Step 1. Know what fixes the finish time.
What we see: the finish time is the start time plus the time the whole job takes.
What it means: we need either the start time and the job length, or enough points along the way to work out the rate and the end.
What we do and why: we check each statement for one of these.
Step 2. Statement 1: started at 8:30 for a 2-hour job.
What we see: a start time and a total length.
What it means: 8:30 plus 2 hours is 10:30. The question already says "that morning", so 8:30 is a.m.
What we do and why: one finish time, so Statement 1 alone is sufficient.
Step 3. Statement 2: half done at 9:30, five-sixths done at 10:10.
What we see: two progress points, 40 minutes apart.
What it means: in those 40 minutes the machine did \(\dfrac{5}{6} - \dfrac{1}{2} = \dfrac{1}{3}\) of the order. At a steady rate, \(\dfrac{1}{6}\) of the order takes 20 minutes. At 10:10 there is \(1 - \dfrac{5}{6} = \dfrac{1}{6}\) left, so it finishes 20 minutes later, at 10:30.
What we do and why: one finish time, so Statement 2 alone is sufficient.
Step 4. Check that the statements agree.
What we see: both give 10:30.
What it means: the question is well built. Statement 2 also tells us the whole job takes \(6 \times 20 = 120\) minutes, which matches Statement 1's 2 hours.
What we do and why: each statement alone answers the question.
The trap: thinking Statement 2 needs the start time. Two progress points at a steady rate give the rate, and the rate plus one point gives the finish.
Faster way: Statement 2 says the last sixth takes as long as half of the third done between the two times: half of 40 minutes is 20 minutes, so 10:10 plus 20 minutes.
Takeaway: at a steady rate, two "fraction done at this time" points are enough to find any other time in the job.
Answer: D