Live GMAT classes with Target Test Prep start Nov 21 and Nov 22. First class free.

See classes
Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

Newsweek Readers’ Choice Awards 2026 winner: Target Test Prep, #1 Test Prep

Target Test Prep was voted #1 Best Test Prep in the 2026 Newsweek Readers’ Choice™ Awards.

★★★★★5.0563 reviews
GMATLiveTeachStarts Nov 22
Josh Braslow, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Josh Braslow, 20+ years in test prep

Nov 22 · Josh Braslow
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemandStart anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

EXECUTIVE ASSESSMENT

with

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemandStart anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

At a loading dock, each worker on the night crew loaded 3/4 as many boxes as each worker on the day crew. If the night

Expert replies
by VJesus12 » Tue Jun 30, 2020 7:54 am
Timer
00:00
Your answer
Difficulty–

right wrong

Pick an answer to see how members did

At a loading dock, each worker on the night crew loaded 3/4 as many boxes as each worker on the day crew. If the night crew has 4/5 as many workers as the day crew, what fraction of all the boxes loaded by the two crews did the day crew load?

(A) 1/2
(B) 2/5
(C) 3/5
(D) 4/5
(E) 5/8

[spoiler]OA=E[/spoiler]

Source: Official Guide
Join the discussion
Source: — Problem Solving |

VJesus12 wrote: ↑
Tue Jun 30, 2020 7:54 am
At a loading dock, each worker on the night crew loaded 3/4 as many boxes as each worker on the day crew. If the night crew has 4/5 as many workers as the day crew, what fraction of all the boxes loaded by the two crews did the day crew load?

(A) 1/2
(B) 2/5
(C) 3/5
(D) 4/5
(E) 5/8

[spoiler]OA=E[/spoiler]

Source: Official Guide
Since the two pieces of information regarding the night shift are related to the information regarding the day shift, let's assign some nice values to the day shift.

Number of workers

Day shift: 5 workers (this is an easy number to find 4/5 of)
Night shift: 4 workers (4/5 of 5 = 4)

Boxes loaded per worker
Day shift: 4 boxes per worker
Night shift: 3 boxes per worker (3/4 of 4 = 3)

Total boxes loaded
Day shift: 5 workers times 4 boxes per worker = 20 boxes
Night shift: 4 workers times 3 boxes per worker = 12 boxes

Combined total boxes for both shifts = 20 + 12 = 32

Of the 32 boxes, the day shift loaded 20 of them.
20/32 = 5/8 = E

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

VJesus12 wrote: ↑
Tue Jun 30, 2020 7:54 am
At a loading dock, each worker on the night crew loaded 3/4 as many boxes as each worker on the day crew. If the night crew has 4/5 as many workers as the day crew, what fraction of all the boxes loaded by the two crews did the day crew load?

(A) 1/2
(B) 2/5
(C) 3/5
(D) 4/5
(E) 5/8

[spoiler]OA=E[/spoiler]

Source: Official Guide
Solution:

We are given that the night crew loaded 3/4 as many boxes as each worker on the day crew and that the night crew has 4/5 as many workers as the day crew.

4/5(number of day workers) = number of night workers

Let's choose the convenient value of 20 for the number of day workers and substitute it into the equation above:

4/5 x 20 = number of night workers

16 = number of night workers

Next, we set up the equation for the number of boxes loaded by each worker.

(¾) x (number of boxes loaded by each day worker) = number of boxes loaded by each night worker

Now let's choose the convenient value of 8 for the number of boxes loaded by each day worker and substitute it into the above equation:

¾ x 8 = number of boxes loaded by each night worker

6 = number of boxes loaded by each night worker

Thus, the total number of boxes loaded by each type of worker is as follows:

Day workers = 20 x 8 = 160

Night workers = 16 x 6 = 96

Total boxes loaded = 160 + 96 = 256

The question asks us to determine the fraction of all the boxes loaded by the day crew, and that is:

(Total boxes loaded by day crew)/(Total boxes loaded)

160/256 = 40/64 = 5/8

Answer: E

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion