BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Work/Rate Problems

Expert replies
by swerve » Tue Apr 28, 2020 11:25 am

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

A machine that produces stroopwafels operates for four hours. During the first hour the machine works at a constant rate. During the next two hours, it works at double that rate, and during the last hour it works at double its previous rate. If the machine produces X stroopwafels during the three first hours, then during the four hours the machine produces how many stroopwafels?

A. \(\dfrac{4}{5}X\)
B. \(\dfrac{9}{5}X\)
C. \(2X\)
D. \(\dfrac{9}{4}X\)
E. \(\dfrac{7}{3}X\)

The OA is B

Source: Economist GMAT
Join the discussion
Source: — Problem Solving |

Re: Work/Rate Problems

by Scott@TargetTestPrep » Fri May 01, 2020 3:17 am
swerve wrote:
Tue Apr 28, 2020 11:25 am
A machine that produces stroopwafels operates for four hours. During the first hour the machine works at a constant rate. During the next two hours, it works at double that rate, and during the last hour it works at double its previous rate. If the machine produces X stroopwafels during the three first hours, then during the four hours the machine produces how many stroopwafels?

A. \(\dfrac{4}{5}X\)
B. \(\dfrac{9}{5}X\)
C. \(2X\)
D. \(\dfrac{9}{4}X\)
E. \(\dfrac{7}{3}X\)

The OA is B

Source: Economist GMAT
We can let the rate of the machine during the first hour be 10 stroopwafels, and thus, the rate during the next two hour is 20 stroopwafels per hour, and the rate during the last hour is 40 stroopwafels. Therefore, during the first 3 hours, the machine produces 10 + 2 * 20 = 50 stroopwafels. We see that X = 50 and therefore, since the total number of stroopwafels produced during the four hours is 50 + 40 = 90, we see that this is 9/5 * X.

Answer: B

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion