BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Working simultaneously and independently at an identical con

Expert replies
by BTGmoderatorDC » Wed Feb 27, 2019 8:31 pm

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty—

Working simultaneously and independently at an identical constant rate, 4 machines of a certain type can produce a total of x units of product P in 6 days. How many of these machines, working simultaneously and independently at this constant rate, can produce a total of 3x units of product P in 4 days?

A. 24
B. 18
C. 16
D. 12
E. 8

OA B

Source: GMAT Prep
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Thu Feb 28, 2019 3:48 am
BTGmoderatorDC wrote:Working simultaneously and independently at an identical constant rate, 4 machines of a certain type can produce a total of x units of product P in 6 days. How many of these machines, working simultaneously and independently at this constant rate, can produce a total of 3x units of product P in 4 days?

A. 24
B. 18
C. 16
D. 12
E. 8
Use the following equation:

(machines)(time) / output = (machines)(time) / output

In the equation above:
Machines and time are INVERSELY PROPORTIONAL.
As the number of machines increases, the amount of time required to produce the same output decreases.
Machines and output are DIRECTLY PROPORTIONAL.
As the number of machines increases, the amount of output also increases.
Time and output are also DIRECTLY PROPORTIONAL.
As the amount of time increases, the amount of output also increases.

Let x=1.
Since 4 machines take 6 days to produce x=1 unit, and we want to know how many machines are required to produce 3x=3 units in 4 days, we get:
(4 machines)(6 days)/(1 unit) = (n machines)(4 days)/(3 units)
24 = 4n/3
72 = 4n
18 = n

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Brent@GMATPrepNow » Thu Feb 28, 2019 5:57 am
BTGmoderatorDC wrote:Working simultaneously and independently at an identical constant rate, 4 machines of a certain type can produce a total of x units of product P in 6 days. How many of these machines, working simultaneously and independently at this constant rate, can produce a total of 3x units of product P in 4 days?

A. 24
B. 18
C. 16
D. 12
E. 8

OA B

Source: GMAT Prep
Let's assign a nice value to x (a value that will work well with all of the numbers 3, 4 and 6.

Let's say x = 24

GIVEN: 4 machines make x units in 6 days
This means 4 machines make 24 units in 6 days
So, 4 machines make 4 units in 1 day [if you divide the work time by 6, the output is also divided by 6]
So, 1 machine makes 1 unit in 1 day [if you divide the number of machines by 4, the output is also divided by 4]

From here, we can answer the question How many of these machines, working simultaneously and independently at this constant rate, can produce a total of 3x units of product P in 4 days?
If x = 24, 3x = 72
Our goal is to make 72 units in 4 days.

So, 1 machine makes 4 units in 4 days [if you multiply the work time by 4, the output is also multiplied by 4]
So, 18 machines make 72 units in 4 days [if you multiply the number of machines by 18, the output is also multiplied by 18]

Answer: B

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by swerve » Fri Mar 01, 2019 9:19 am
We have x units by 4 machines in 6 days

\(\Rightarrow \, x\) units in 24 machine days
\(\Rightarrow\, 3x\) units in 72 machine days

Therefore machine required \(= \frac{72}{4} = 18\)
Join the discussion

by Scott@TargetTestPrep » Mon Mar 04, 2019 7:03 pm
BTGmoderatorDC wrote:Working simultaneously and independently at an identical constant rate, 4 machines of a certain type can produce a total of x units of product P in 6 days. How many of these machines, working simultaneously and independently at this constant rate, can produce a total of 3x units of product P in 4 days?

A. 24
B. 18
C. 16
D. 12
E. 8

OA B

Source: GMAT Prep
We are given that 4 machines can complete x units in 6 days. Thus, the rate of the 4 machines is x/6.

Now, we need to determine the number of machines needed to produce a rate of 3x/4. To calculate that number of machines, we can use the following proportion in which the value in each numerator is the number of machines and the value in each denominator is the corresponding rate of those machines. We can let n = the number of machines needed:

4/(x/6) = n/(3x/4)

24/x = 4n/3x

72x = 4nx

18 = n

Alternate Solution:

If 4 machines can produce a total of x units of product P in 6 days, then 12 machines can produce 3x units of product P in 6 days. To find the number of machines needed to produce 3x units in 4 days, let's set up an inverse proportion, denoting the number of machines needed by n. The proportion is: "12 machines is to 6 days as n machines is to 4 days":

12 x 6 = 4 x n

n = 3 x 6 = 18

Answer: B

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion