BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Toy Factory Machine

Expert replies
by BTGmoderatorDC » Sun Sep 10, 2017 2:07 am
Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20

B. 25

C. 30

D. 40

E. 50

How to come up with the right answer?
What is the perfect solution to this problem? Can some experts help me?


OA A
Join the discussion
Source: — Problem Solving |

by Jay@ManhattanReview » Sun Sep 10, 2017 4:11 am
lheiannie07 wrote:Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20

B. 25

C. 30

D. 40

E. 50
How to come up with the right answer?
What is the perfect solution to this problem? Can some experts help me?
OA A
Given that in 3 minutes, an old machine can assemble 1 toy, thus in 1 hour (= 60 minutes), it can assemble [1*(30/3)] = 20 toys

Say there are 100 old machines.

Thus, in 1 hour, 100 old machines can assemble 20*100 = 2000 toys.

Now, 40% of the machine is replaced by new machines.
Thus, the number of new machines = 40, and old machines = 100 - 40 = 60

Given that in 2 minutes, a new machine can assemble 1 toy, thus in 1 hour (= 60 minutes), it can assemble [1*(30/2)] = 30 toys

Now, the number of toys produced in 1-hour = (Number of toys produced by old machines) + (Number of toys produced by new machines)

= 20*60 + 30*40 = 1200 + 1200 = 2400 toys

Percent increase in the number of toys assembled = [(2400 - 2000)/2000]*100% = 20%.

The correct answer: A

Hope this helps!

Download free ebook: Manhattan Review GMAT Quantitative Question Bank Guide

-Jay
_________________
Manhattan Review GMAT Prep

Locations: New York | Jakarta | Nanjing | Berlin | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
Join the discussion

by [email protected] » Sun Sep 10, 2017 9:42 am
Hi lheiannie07 ,

This question can be solved by TESTing VALUES.

We're told that each machine can currently create one toy every 3 minutes. We're then told that 40 percent of the machines will be replaced by new machines that can assemble one toy every 2 minutes. We're asked for the percent increase in the number of toys assembled in one hour by all the machines at the factory.

Since we're replacing 40% of the machines, let's TEST 5 total machines.
One toy every 3 minutes = 20 toys/hour
One toy every 2 minutes = 30 toys/hour

Original Machines
(5 machines)(20 toys/hour) = 100 toys/hour produced

New 'mix' of Machines
(3 machines)(20 toys/hour) = 60 toys/hour produced
(2 machines)(30 toys/hour) = 60 toys/hour produced
Total = 120 toys/hour produced

Percent Change = (New - Old)/(Old) = (120 - 100)/100 = 20/100 = 20%

Final Answer: A

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Scott@TargetTestPrep » Tue Oct 23, 2018 6:19 pm
BTGmoderatorDC wrote:Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20

B. 25

C. 30

D. 40

E. 50

The rate of one old machine is 20 toys per hour. The rate of one new machine is 30 toys per hour.

Let's assume that there are 10 old machines. So, before any of them are replaced, the number of toys produced in an hour is 10 x 20 = 200.

Since 40 percent of the old machines are replaced with new machines, we have now 6 old machines and 4 new machines, and the number of toys produced in an hour is 6 x 20 + 4 x 30 = 240.

Therefore, the the percent increase in the productivity per hour is:

(New - Old)/Old x 100 = (240 - 200)/200 x 100 = 40/200 x 100 = 20 percent

Answer: A