BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

work

Expert replies
by vaibhav101 » Sun Jun 03, 2018 9:51 am

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty—

3 men, 4 women and 6 children can complete a work in 7 days. A woman does double the work a man does and a child does half the work a man does. How many women alone can complete this work in 7 days?

A 7
B 8
C 12
D 15
E none of these
Join the discussion
Source: — Problem Solving |

by Vincen » Mon Jun 11, 2018 12:59 am
Hello.

We know that the job can be completed in 7 days when there are working

- 3 M (men)
- 4 W (women)
- 6 C (children)

Also, we know that "a woman does double the work a man does", hence $$W=2M\ \ \ \Rightarrow\ \ \ \ M=\frac{W}{2}$$ and "a child does half the work a man does", hence $$C=\frac{M}{2}\ \ \ \Rightarrow\ \ \ \ C=\frac{\frac{W}{2}}{2}=\frac{W}{4}.$$ Then, the job can be completed in 7 days when there are working

- 3M =(3/2)W.
- 4W
- 6C= (6/4)W=(3/2)W

If we sum these quantities we will get that there are needed 7 women to complete the job in 7 days.

Therefore, the correct answer is the option A.

I hope it is clear enough.
Join the discussion

by GMATGuruNY » Mon Jun 11, 2018 2:16 am
vaibhav101 wrote:3 men, 4 women and 6 children can complete a work in 7 days. A woman does double the work a man does and a child does half the work a man does. How many women alone can complete this work in 7 days?

A 7
B 8
C 12
D 15
E none of these
Let the rate for each child = 1 unit per day.
Since each child does half the work of a man, the rate for each man = 2 units per day.
Since each woman does double the work of a man, the rate for each woman = 4 units per day.

Combined rate for 3 men, 4 women and 6 children = (3*2) + (4*4) + (6*1) = 28 units per day.
Over 7 days, the amount of work produced by 3 men, 4 women and 6 children = rt = 7*28 units.

To complete the job in 7 days, the required rate = w/t = (7*28)/7 = 28 units per day.
Since each woman produces 4 units per day, the number of women required to produce 28 units per day = 28/4 = 7.

The correct answer is A.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Brent@GMATPrepNow » Mon Jun 11, 2018 4:38 am
vaibhav101 wrote:3 men, 4 women and 6 children can complete a work in 7 days. A woman does double the work a man does and a child does half the work a man does. How many women alone can complete this work in 7 days?

A 7
B 8
C 12
D 15
E none of these
Starting point: 3 men, 4 women and 6 children

A child does half the work a man does.
In other words, 1 child = 1/2 a man
This means 6 children = 3 men
So, let's just REPLACE the 6 children with 3 men to get: 6 men and 4 women

A woman does double the work a man does
In other words, 1 man = 1/2 a woman
This means 6 men = 3 women
So, let's just REPLACE the 6 men with 3 women to get: 7 women

Answer: A

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by Jeff@TargetTestPrep » Wed Jun 13, 2018 3:37 pm
vaibhav101 wrote:3 men, 4 women and 6 children can complete a work in 7 days. A woman does double the work a man does and a child does half the work a man does. How many women alone can complete this work in 7 days?

A 7
B 8
C 12
D 15
E none of these
We can let the rate of a man = m, the rate of a woman = 2m, and the rate of a child = (1/2)m, thus:

3m + 4(2m) + 6[(1/2)m] = 1/7

3m + 8m + 3m = 1/7

14m = 1/7

m = 1/98

So the rate of a woman = 2/98 = 1/49 of the job per day.

Thus, in 7 days, a woman can complete 7 x 1/49 = 1/7 of the job. So if there are 7 women, they can complete 7 x 1/7 = 1 entire job.

Alternate Solution:

Since a child does half the work a man does, the work done by 3 men, 4 women and 6 children is equivalent to the work done by 3 + 6/2 = 6 men and 4 women. Since a woman does twice the work a man does, the work done by 6 men and 4 women is equivalent to the work done by 6/2 + 4 = 7 women. So, 7 women can complete the job in 7 days.

Answer: A

Jeffrey Miller
Head of GMAT Instruction
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews
Join the discussion