BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

PS : Pumps A,B,C

Expert replies
by Xbond » Sat Dec 12, 2009 9:24 am
Hi there,

Could help me to understand why the right answer of this PS is E. I pick B but I didn't find why it is E
A complete explanation is welcome.

Pumps A, B, and C operate at their respective constant rates. Pumps A and B, operating simultaneously, can fill a certain tank in 6/5 hours; pumps A and C, operating simultaneously, can fill the tank in 3/2 hours; and pumps B and C, operating
simultaneously, can fill the tank in 2 hours. How many hours does it take pumps A, B, and C, operating simultaneously, to fill the tank ?

A) 1/3
B) 1/2
C) 2/3
D) 5/6
E) 1
Join the discussion
Source: — Problem Solving |

by Testluv » Sat Dec 12, 2009 10:18 am
Xbond wrote:Hi there,

Could help me to understand why the right answer of this PS is E. I pick B but I didn't find why it is E
A complete explanation is welcome.

Pumps A, B, and C operate at their respective constant rates. Pumps A and B, operating simultaneously, can fill a certain tank in 6/5 hours; pumps A and C, operating simultaneously, can fill the tank in 3/2 hours; and pumps B and C, operating
simultaneously, can fill the tank in 2 hours. How many hours does it take pumps A, B, and C, operating simultaneously, to fill the tank ?

A) 1/3
B) 1/2
C) 2/3
D) 5/6
E) 1
Rate and time are always inversely related:

AB's rate is 6/5, so in 1 hour, AB will do 5/6 of the job.
AC's rate is 3/2, so in 1 hour, AC will do 2/3 of the job.
BC's rate is 2, so in 1 hour, BC will do 1/2 of the job.

Let the number of units in the total job be a number that is a multiple of 6, 3, and 2; let's say there are 18 units in the total job.

Then, in one hour:

AB will complete 5/6*18 = 15 units;
AC will complete 2/3*18 = 12 units;
BC will complete 1/2*18 = 9 units.

Summing up:
2 As, 2 Bs, and 2Cs complete 36 units.
So, in one hour, 2 of each of the pumps will complete two jobs. Therefore, it will take 1 of each of the pumps 1 hour to complete the job.
Kaplan Teacher in Toronto
Join the discussion

by Xbond » Mon Dec 14, 2009 12:11 pm
many thks
Join the discussion

by batbond007 » Mon Dec 14, 2009 12:53 pm
Other way

1/Total time = 1/A + 1/B + 1/C + ... + 1/N

1/time for 2A + 2B + 2C = 5/6 + 2/3 + 1/2 = 2 hrs

Hence time for 2A + 2B + 2C = 1/2 hrs

Hence time for A + B + C = 1 hr.
Join the discussion