BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Toy Factory Machine

Expert replies
by BTGmoderatorDC » Sun Sep 10, 2017 1:54 am
Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20

B. 25

C. 30

D. 40

E. 50

How to come up with the right answer?
What is the perfect solution to this problem? Can some experts help me?


OA A
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Sun Sep 10, 2017 3:29 am
lheiannie07 wrote:Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20

B. 25

C. 30

D. 40

E. 50
Since the GCF of the two times is 6, calculate the number of toys produced every 6 minutes.
Let the number of machines = 10.

10 old machines:
Since each old machine produces 1 toy in 3 minutes, 10 old machines produce 10 toys in 3 minutes.
Thus, the number of toys produced in 6 minutes -- double the amount of time -- is 20.

When 40% of the old machines are replaced by new machines, the number of new machines = (40/100)(10) = 4.

4 new machines:
Since each new machine produces 1 toy in 2 minutes, 4 toys are produced in 2 minutes.
Thus, the number of toys produced in 6 minutes -- triple the amount of time -- is 12.
6 old machines:
Since 6 old machines produce 6 toys in 3 minutes, the number of toys produced in 6 minutes -- double the amount of time -- is 12.
Total toys produced in 6 minutes by 4 new machines and 6 old machines = 12+12 = 24.

Percent increase from 20 to 24 = (difference)/(original) * 100 = (24-20)/20 * 100 = 20%.

The correct answer is A.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by [email protected] » Sun Sep 10, 2017 9:43 am
Hi lheiannie07 ,

This question can be solved by TESTing VALUES.

We're told that each machine can currently create one toy every 3 minutes. We're then told that 40 percent of the machines will be replaced by new machines that can assemble one toy every 2 minutes. We're asked for the percent increase in the number of toys assembled in one hour by all the machines at the factory.

Since we're replacing 40% of the machines, let's TEST 5 total machines.
One toy every 3 minutes = 20 toys/hour
One toy every 2 minutes = 30 toys/hour

Original Machines
(5 machines)(20 toys/hour) = 100 toys/hour produced

New 'mix' of Machines
(3 machines)(20 toys/hour) = 60 toys/hour produced
(2 machines)(30 toys/hour) = 60 toys/hour produced
Total = 120 toys/hour produced

Percent Change = (New - Old)/(Old) = (120 - 100)/100 = 20/100 = 20%

Final Answer: A

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by BTGmoderatorDC » Thu Oct 12, 2017 1:50 pm
GMATGuruNY wrote:
lheiannie07 wrote:Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20

B. 25

C. 30

D. 40

E. 50
Since the GCF of the two times is 6, calculate the number of toys produced every 6 minutes.
Let the number of machines = 10.

10 old machines:
Since each old machine produces 1 toy in 3 minutes, 10 old machines produce 10 toys in 3 minutes.
Thus, the number of toys produced in 6 minutes -- double the amount of time -- is 20.

When 40% of the old machines are replaced by new machines, the number of new machines = (40/100)(10) = 4.

4 new machines:
Since each new machine produces 1 toy in 2 minutes, 4 toys are produced in 2 minutes.
Thus, the number of toys produced in 6 minutes -- triple the amount of time -- is 12.
6 old machines:
Since 6 old machines produce 6 toys in 3 minutes, the number of toys produced in 6 minutes -- double the amount of time -- is 12.
Total toys produced in 6 minutes by 4 new machines and 6 old machines = 12+12 = 24.

Percent increase from 20 to 24 = (difference)/(original) * 100 = (24-20)/20 * 100 = 20%.

The correct answer is A.
Thanks a lot!
Join the discussion

by BTGmoderatorDC » Thu Oct 12, 2017 1:51 pm
[email protected] wrote:Hi lheiannie07 ,

This question can be solved by TESTing VALUES.

We're told that each machine can currently create one toy every 3 minutes. We're then told that 40 percent of the machines will be replaced by new machines that can assemble one toy every 2 minutes. We're asked for the percent increase in the number of toys assembled in one hour by all the machines at the factory.

Since we're replacing 40% of the machines, let's TEST 5 total machines.
One toy every 3 minutes = 20 toys/hour
One toy every 2 minutes = 30 toys/hour

Original Machines
(5 machines)(20 toys/hour) = 100 toys/hour produced

New 'mix' of Machines
(3 machines)(20 toys/hour) = 60 toys/hour produced
(2 machines)(30 toys/hour) = 60 toys/hour produced
Total = 120 toys/hour produced

Percent Change = (New - Old)/(Old) = (120 - 100)/100 = 20/100 = 20%

Final Answer: A

GMAT assassins aren't born, they're made,
Rich
Thank you so much!
Join the discussion

by Matt@VeritasPrep » Thu Oct 12, 2017 8:55 pm
And in case anybody wants the algebra, it'd look like this:

We start with t machines that each produce (1/3) of a toy per minute. That nets us (t/3) toys per minute.

After the replacement, we've got 0.6t machines that each produce (1/3) of a toy per minute and 0.4t machines that each produce (1/2) of toy per minute. That nets us 0.6t/3 + 0.4t/2 toys per minute, or 0.4t toys per minute, or (2/5)t toys per minute.

We've gone from (1/3)t to (2/5)t per minute, a percent increase of (2/5 - 1/3)/(1/3), or 1/5, or 20%.
Join the discussion

by Scott@TargetTestPrep » Sun Nov 24, 2019 5:26 pm
BTGmoderatorDC wrote:Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20

B. 25

C. 30

D. 40

E. 50

How to come up with the right answer?
What is the perfect solution to this problem? Can some experts help me?


OA A
The rate of one old machine is 20 toys per hour. The rate of one new machine is 30 toys per hour.

Let's assume that there are 10 old machines. So, before any of them are replaced, the number of toys produced in an hour is 10 x 20 = 200.

Since 40 percent of the old machines are replaced with new machines, we have now 6 old machines and 4 new machines, and the number of toys produced in an hour is 6 x 20 + 4 x 30 = 240.

Therefore, the percent increase in the productivity per hour is:

(New - Old)/Old x 100 = (240 - 200)/200 x 100 = 40/200 x 100 = 20 percent

Answer: A

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion