Ten theater students are to begin work on a set for a musical. Working at a constant rate, they will finish the set in 60 days, but the director of the musical decides they need to finish in 50 days. How many more theater students, working at the same constant rate, must work to finish the set on time?

A. 2
B. 3
C. 5
D. 10
E. 12

OA A

Source: Veritas Prep
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Sat Apr 27, 2019 1:58 am
BTGmoderatorDC wrote:Ten theater students are to begin work on a set for a musical. Working at a constant rate, they will finish the set in 60 days, but the director of the musical decides they need to finish in 50 days. How many more theater students, working at the same constant rate, must work to finish the set on time?

A. 2
B. 3
C. 5
D. 10
E. 12
(50 days)/(60 days) = 5/6.
To finish the job in 5/6 of the normal time, the crew requires 6/5 of the normal number of students -- an increase of 1/5:
(1/5)(10) = 2 more students.

The correct answer is A.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Scott@TargetTestPrep » Mon May 06, 2019 7:08 pm
BTGmoderatorDC wrote:Ten theater students are to begin work on a set for a musical. Working at a constant rate, they will finish the set in 60 days, but the director of the musical decides they need to finish in 50 days. How many more theater students, working at the same constant rate, must work to finish the set on time?

A. 2
B. 3
C. 5
D. 10
E. 12

OA A

Source: Veritas Prep
We are given that 10 theater students will finish a set in 60 days. Since rate = work/time, the rate of those students is 1/60 = 1/60. However, since the set needs to be completed in 50 days, we can create the following proportion to determine how many more students are needed, to complete the job in 50 days:

10 students is to a rate of 1/60 as x students is to a rate of 1/50.

10/(1/60) = x/(1/50)

600 = 50x

12 = x

Thus, 2 more students will be needed to complete the set in 50 days.

Answer: A