BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
Live EA class + 6 months of EA OnDemand
  • Expert-led weekly online sessions
  • EA Masterclass access between classes
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

130-point score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

stumped by work flow problem

Expert replies

by HermioneGranger » Thu Dec 11, 2008 1:41 pm
A takes 20 days---> 1 day work done by A is 1/20
B takes 30 days---> 1 day work done by B is 1/30

Together in 1 day---> 1/20=1/30=5/60=1/12 work is done

A quit 10 days before the project was completed which means B worked alone for 10 days and therefore complete 10*1/30 = 1/3rd of the total work.

2/3rd of the work was done by A and B together at 1/12th work per day.
Therefore days taken to complete work together = (2/3)/(1/12) = 24/3= 8 days

Therefore total days taken for completion of the project is 8+10 = 18 days
Win as if you were used to it; lose as if you enjoyed it for a change!
Join the discussion

by dendude » Thu Dec 11, 2008 3:44 pm
dmateer & parallel_chase,

I think I did make the assumption that A quits 10 days before the time A&B together would've completed the job.
Going with the nature of the GMAT, this q could'nt have been that straightforward :)

Anyway thanks for pointing out the "fatal" consequences of assuming wrong on the GMAT.
Join the discussion